IAC Assessment: HO0137
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0137
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1996
Principal Product Plastic bags
NAICS n/a
SIC 2736 -
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 75,000
Annual Production 300,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $210,257 2,539,859 kWh $0.08
Electricity Demand $45,446 7,432 kW-months/year $6.11
Electricity Fees $24,618 - $ -
Natural Gas $111,835 19,334 MMBtu $5.78
TOTAL ENERGY COSTS $392,156
RECOMMENDED SAVINGS* $561,638 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $561,638
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,704
Cost:
$2,559
$1,484 17,878 $220 36 - - - - - - $1,484
17,878
kWh
$220
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$724
Cost:
$610
$724 8,792 - - - - - - - - $724
8,792
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,210
Cost:
$2,997
- - - - $9,210 1,593 - - - - -
-
kWh
-
-
kW-months/year
$9,210
1,593
MMBtu
-
-
$
-
-
$
04: 3.8126 USE FLUE GAS RECUPERATION TO REDUCE VOC Savings:
$500,000
Cost:
$2,000
- - - - - - - - $500,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$500,000
-
$
05: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$50,000
Cost:
$25,000
- - - - - - $50,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$50,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$561,638
Cost:
$33,166
$2,208 26,670 $220 36 $9,210 1,593 $50,000 - $500,000 - $2,208
26,670
kWh
$220
36
kW-months/year
$9,210
1,593
MMBtu
$50,000
-
$
$500,000
-
$
TOTAL IMPLEMENTED Savings:
$561,638
Cost:
$33,166
$2,208 26,670 $220 36 $9,210 1,593 $50,000 - $500,000 - $2,208
26,670
kWh
$220
36
kW-months/year
$9,210
1,593
MMBtu
$50,000
-
$
$500,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost