IAC Assessment: HO0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product TEXTILE DYEING
NAICS n/a
SIC 2269 - Finishing Plants, Nec
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 56,000
Annual Production 5,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,339 535,170 kWh $0.12
Electricity Fees $5,906 - $ -
Natural Gas $312,609 61,271 MMBtu $5.10
TOTAL ENERGY COSTS $384,854
RECOMMENDED SAVINGS* $129,598 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Personnel Changes Electricity Usage Natural Gas Water Disposal Personnel Changes
$ kWh $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,920
Cost:
$7,836
$3,920 31,653 - - - - - - $3,920
31,653
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,058
Cost:
$9,780
$3,058 24,619 - - - - - - $3,058
24,619
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,610
Cost:
$3,411
- - $10,610 2,080 - - - - -
-
kWh
$10,610
2,080
MMBtu
-
-
Tgal
-
-
$
04: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$79,100
Cost:
$300,000
- - - - $79,100 18,700,000 - - -
-
kWh
-
-
MMBtu
$79,100
18,700,000
Tgal
-
-
$
05: 3.4151 MINIMIZE WATER USAGE Savings:
$7,910
Cost:
$2,000
- - - - $7,910 1,870,000 - - -
-
kWh
-
-
MMBtu
$7,910
1,870,000
Tgal
-
-
$
06: 4.632 CHANGE OPERATING CONDITIONS Savings:
$25,000
Cost:
-
- - - - - - $25,000 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$25,000
-
$
TOTAL RECOMMENDED Savings:
$129,598
Cost:
$323,027
$6,978 56,272 $10,610 2,080 $87,010 20,570,000 $25,000 - $6,978
56,272
kWh
$10,610
2,080
MMBtu
$87,010
20,570,000
Tgal
$25,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal Personnel Changes Electricity Usage Natural Gas Water Disposal Personnel Changes