Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Hofstra Univ. |
---|---|
Assessment Year | 1997 |
Principal Product | Sheet metal fabricators |
NAICS | n/a |
SIC | 3444 - Sheet Metalwork |
Sales | $5,000,000-$10,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 1,300,000 Pounds |
Production Hrs. Annual | 2,860 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $23,076 | 387,163 | kWh | $0.06 |
Electricity Demand | $42,860 | 1,872 | kW-months/year | $22.90 |
Electricity Fees | $4,772 | - | $ | - |
Natural Gas | $18,448 | 1,957 | MMBtu | $9.43 |
TOTAL ENERGY COSTS | $89,156 | |||
RECOMMENDED SAVINGS* | $143,736 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,232 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,534 Cost: $16,787 |
$2,866 | 47,773 | $4,668 | 204 | - | - | - | - | - | - |
$2,866 47,773 kWh |
$4,668 204 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $798 Cost: $3,720 |
$798 | 13,189 | - | - | - | - | - | - | - | - |
$798 13,189 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,226 Cost: $400 |
$471 | 7,913 | $755 | 33 | - | - | - | - | - | - |
$471 7,913 kWh |
$755 33 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,306 Cost: $200 |
$505 | 8,499 | $801 | 35 | - | - | - | - | - | - |
$505 8,499 kWh |
$801 35 kW-months/year |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $2,232 Cost: $1,000 |
- | - | - | - | $2,232 | 603,424 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,232 603,424 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $5,640 Cost: - |
- | - | - | - | - | - | $5,640 | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$5,640 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $75,000 Cost: $40,000 |
- | - | - | - | - | - | - | - | $75,000 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$75,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $50,000 Cost: $50,000 |
- | - | - | - | - | - | - | - | $50,000 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$50,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $143,736 Cost: $112,107 |
$4,640 | 77,374 | $6,224 | 272 | $2,232 | 603,424 | $5,640 | - | $125,000 | - | $4,640 77,374 kWh |
$6,224 272 kW-months/year |
$2,232 603,424 Tgal |
$5,640 - lb |
$125,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,232 Cost: $1,000 |
- | - | - | - | $2,232 | 603,424 | - | - | - | - | - - kWh |
- - kW-months/year |
$2,232 603,424 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Personnel Changes |