IAC logo
IAC Assessment: HO0142
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0142
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Plastic injection molding
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 28,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 5,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $200,977 1,894,490 kWh $0.11
Electricity Demand $42,760 3,818 kW-months/year $11.20
Natural Gas $6,090 580 MMBtu $10.50
TOTAL ENERGY COSTS $309,827
RECOMMENDED SAVINGS* $51,589 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,261
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,261
Cost:
$10,505
$5,051 44,256 $1,210 108 - - - - - - $5,051
44,256
kWh
$1,210
108
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$750
Cost:
$365
$750 6,448 - - - - - - - - $750
6,448
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,003
Cost:
$800
$833 7,327 $170 15 - - - - - - $833
7,327
kWh
$170
15
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,770
Cost:
$750
- - - - $4,770 454 - - - - -
-
kWh
-
-
kW-months/year
$4,770
454
MMBtu
-
-
Tgal
-
-
lb
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$23,805
Cost:
-
$23,805 206,038 - - - - - - - - $23,805
206,038
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$12,000
Cost:
$6,500
- - - - - - - - $12,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$12,000
-
lb
07: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$3,000
Cost:
$6,750
- - - - - - $3,000 9,240,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,000
9,240,000
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$51,589
Cost:
$25,670
$30,439 264,069 $1,380 123 $4,770 454 $3,000 9,240,000 $12,000 - $30,439
264,069
kWh
$1,380
123
kW-months/year
$4,770
454
MMBtu
$3,000
9,240,000
Tgal
$12,000
-
lb
TOTAL IMPLEMENTED Savings:
$6,261
Cost:
$10,505
$5,051 44,256 $1,210 108 - - - - - - $5,051
44,256
kWh
$1,210
108
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)