IAC logo
IAC Assessment: HO0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Guitars
NAICS n/a
SIC 3931 - Musical Instruments
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 18,000
Annual Production 24,000 Pieces
Production Hrs. Annual 5,200
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $127,481 3,076,788 kWh $0.04
Electricity Demand $91,499 9,581 kW-months/year $9.55
Electricity Fees $3,755 - $ -
Natural Gas $142,191 20,868 MMBtu $6.81
TOTAL ENERGY COSTS $371,826
RECOMMENDED SAVINGS* $147,710 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,507
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,944
Cost:
$21,668
$3,881 93,787 $2,063 216 - - - - - - $3,881
93,787
kWh
$2,063
216
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$178
Cost:
$575
$178 4,396 - - - - - - - - $178
4,396
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,425
Cost:
$3,182
- - - - $6,425 944 - - - - -
-
kWh
-
-
kW-months/year
$6,425
944
MMBtu
-
-
gal
-
-
$
04: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$15,600
Cost:
$10,800
- - - - - - - - $15,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$15,600
-
$
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$117,000
Cost:
$525,000
- - - - - - - - $117,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$117,000
-
$
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$2,563
Cost:
$10,000
- - - - $(-363) (-53) $2,926 4,240 - - -
-
kWh
-
-
kW-months/year
$(-363)
(-53)
MMBtu
$2,926
4,240
gal
-
-
$
TOTAL RECOMMENDED Savings:
$147,710
Cost:
$571,225
$4,059 98,183 $2,063 216 $6,062 891 $2,926 4,240 $132,600 - $4,059
98,183
kWh
$2,063
216
kW-months/year
$6,062
891
MMBtu
$2,926
4,240
gal
$132,600
-
$
TOTAL IMPLEMENTED Savings:
$8,507
Cost:
$31,668
$3,881 93,787 $2,063 216 $(-363) (-53) $2,926 4,240 - - $3,881
93,787
kWh
$2,063
216
kW-months/year
$(-363)
(-53)
MMBtu
$2,926
4,240
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes