IAC logo
IAC Assessment: HO0159
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0159
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Fiberglass pumps
NAICS n/a
SIC 3561 - Pumps And Pumping Equipment
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 48,000
Annual Production 1,820 Pieces
Production Hrs. Annual 4,925
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,245 983,001 kWh $0.07
Electricity Demand $20,897 3,548 kW-months/year $5.89
Electricity Fees $417 - $ -
Natural Gas $19,264 3,051 MMBtu $6.31
TOTAL ENERGY COSTS $119,823
RECOMMENDED SAVINGS* $11,510 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,083
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,357
Cost:
$5,548
$1,145 16,999 $212 36 - - - - - - - - $1,145
16,999
kWh
$212
36
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$787
Cost:
$600
$787 12,016 - - - - - - - - - - $787
12,016
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$296
Cost:
$20
$242 3,810 $54 9 - - - - - - - - $242
3,810
kWh
$54
9
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,080
Cost:
$6,500
- - - - $7,200 1,000 $(-3,120) - - - - - -
-
kWh
-
-
kW-months/year
$7,200
1,000
lb
$(-3,120)
-
$
-
-
$
-
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,070
Cost:
-
- - - - - - - - - - $3,070 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$3,070
-
$
06: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$1,920
Cost:
$500
- - - - - - - - $1,920 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$1,920
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$11,510
Cost:
$13,168
$2,174 32,825 $266 45 $7,200 1,000 $(-3,120) - $1,920 - $3,070 - $2,174
32,825
kWh
$266
45
kW-months/year
$7,200
1,000
lb
$(-3,120)
-
$
$1,920
-
$
$3,070
-
$
TOTAL IMPLEMENTED Savings:
$1,083
Cost:
$620
$1,029 15,826 $54 9 - - - - - - - - $1,029
15,826
kWh
$54
9
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material