Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Hofstra Univ. |
---|---|
Assessment Year | 1997 |
Principal Product | Processed Aluminum Castings |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 14,000 |
Annual Production | 240,000 Pieces |
Production Hrs. Annual | 7,056 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $84,920 | 1,489,742 | kWh | $0.06 |
Electricity Demand | $26,066 | 3,756 | kW-months/year | $6.94 |
Electricity Fees | $1,129 | - | $ | - |
Natural Gas | $29,865 | 3,495 | MMBtu | $8.55 |
TOTAL ENERGY COSTS | $251,980 | |||
RECOMMENDED SAVINGS* | $53,476 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $47,232 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $921 Cost: $4,297 |
$580 | 10,258 | $341 | 49 | - | - | - | - | - | - | - | - |
$580 10,258 kWh |
$341 49 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,383 Cost: $1,982 |
$1,383 | 24,326 | - | - | - | - | - | - | - | - | - | - |
$1,383 24,326 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,369 Cost: $50 |
$1,798 | 31,653 | $571 | 82 | - | - | - | - | - | - | - | - |
$1,798 31,653 kWh |
$571 82 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,139 Cost: $1,000 |
$943 | 16,706 | $196 | 28 | - | - | - | - | - | - | - | - |
$943 16,706 kWh |
$196 28 kW-months/year |
- - lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $10,800 Cost: $30,000 |
- | - | - | - | - | - | $10,800 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$10,800 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $432 Cost: - |
- | - | - | - | - | - | - | - | $432 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$432 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.7132 REUSE RAGS UNTIL COMPLETELY SOILED |
Savings: $432 Cost: - |
- | - | - | - | - | - | - | - | - | - | $432 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
$432 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $36,000 Cost: $80,000 |
- | - | - | - | $36,000 | 900 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$36,000 900 lb |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,476 Cost: $117,329 |
$4,704 | 82,943 | $1,108 | 159 | $36,000 | 900 | $10,800 | - | $432 | - | $432 | - | $4,704 82,943 kWh |
$1,108 159 kW-months/year |
$36,000 900 lb |
$10,800 - $ |
$432 - $ |
$432 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $47,232 Cost: $110,000 |
- | - | - | - | $36,000 | 900 | $10,800 | - | $432 | - | - | - | - - kWh |
- - kW-months/year |
$36,000 900 lb |
$10,800 - $ |
$432 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||