Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Hofstra Univ. |
---|---|
Assessment Year | 1998 |
Principal Product | Narrow Fabrics |
NAICS | n/a |
SIC | 2396 - Automotive And Apparel Trimmings |
Sales | $5,000,000-$10,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 98,000 |
Annual Production | 90,000 Thousand Feet |
Production Hrs. Annual | 2,250 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $29,628 | 470,399 | kWh | $0.06 |
Electricity Demand | $48,284 | 2,157 | kW-months/year | $22.38 |
Electricity Fees | $4,243 | - | $ | - |
Natural Gas | $8,068 | 1,000 | MMBtu | $8.07 |
TOTAL ENERGY COSTS | $98,803 | |||
RECOMMENDED SAVINGS* | $29,969 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,199 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $26,545 Cost: $90,112 |
$9,588 | 152,403 | $16,957 | 742 | - | - | - | - | - | - |
$9,588 152,403 kWh |
$16,957 742 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $133 Cost: $415 |
$133 | 2,052 | - | - | - | - | - | - | - | - |
$133 2,052 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $267 Cost: $500 |
$99 | 1,465 | $168 | 8 | - | - | - | - | - | - |
$99 1,465 kWh |
$168 8 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,092 Cost: $650 |
- | - | - | - | $1,092 | 135 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,092 135 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $807 Cost: $250 |
- | - | - | - | - | - | - | - | $807 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$807 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $1,125 Cost: $100 |
- | - | - | - | - | - | $1,125 | 120,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,125 120,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $29,969 Cost: $92,027 |
$9,820 | 155,920 | $17,125 | 750 | $1,092 | 135 | $1,125 | 120,000 | $807 | - | $9,820 155,920 kWh |
$17,125 750 kW-months/year |
$1,092 135 MMBtu |
$1,125 120,000 lb |
$807 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,199 Cost: $850 |
$99 | 1,465 | $168 | 8 | - | - | $1,125 | 120,000 | $807 | - | $99 1,465 kWh |
$168 8 kW-months/year |
- - MMBtu |
$1,125 120,000 lb |
$807 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes |