IAC logo
IAC Assessment: HO0187
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0187
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1998
Principal Product Narrow Fabrics
NAICS n/a
SIC 2396 - Automotive And Apparel Trimmings
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 98,000
Annual Production 90,000 Thousand Feet
Production Hrs. Annual 2,250
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,628 470,399 kWh $0.06
Electricity Demand $48,284 2,157 kW-months/year $22.38
Electricity Fees $4,243 - $ -
Natural Gas $8,068 1,000 MMBtu $8.07
TOTAL ENERGY COSTS $98,803
RECOMMENDED SAVINGS* $29,969 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,199
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,545
Cost:
$90,112
$9,588 152,403 $16,957 742 - - - - - - $9,588
152,403
kWh
$16,957
742
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$133
Cost:
$415
$133 2,052 - - - - - - - - $133
2,052
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$267
Cost:
$500
$99 1,465 $168 8 - - - - - - $99
1,465
kWh
$168
8
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,092
Cost:
$650
- - - - $1,092 135 - - - - -
-
kWh
-
-
kW-months/year
$1,092
135
MMBtu
-
-
lb
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$807
Cost:
$250
- - - - - - - - $807 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$807
-
$
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$1,125
Cost:
$100
- - - - - - $1,125 120,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,125
120,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$29,969
Cost:
$92,027
$9,820 155,920 $17,125 750 $1,092 135 $1,125 120,000 $807 - $9,820
155,920
kWh
$17,125
750
kW-months/year
$1,092
135
MMBtu
$1,125
120,000
lb
$807
-
$
TOTAL IMPLEMENTED Savings:
$2,199
Cost:
$850
$99 1,465 $168 8 - - $1,125 120,000 $807 - $99
1,465
kWh
$168
8
kW-months/year
-
-
MMBtu
$1,125
120,000
lb
$807
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes