IAC logo
IAC Assessment: HO0200
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0200
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1999
Principal Product Anodizing metals
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 100,000
Annual Production 350,000,000 Pieces
Production Hrs. Annual 5,760
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $340,240 6,192,556 kWh $0.05
Electricity Demand $185,600 29,385 kW-months/year $6.32
Electricity Fees $(-18,479) - $ -
Natural Gas $144,372 27,054 MMBtu $5.34
TOTAL ENERGY COSTS $651,733
RECOMMENDED SAVINGS* $64,861 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,436
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,818
Cost:
$7,776
$2,212 40,152 $606 96 - - - - $2,212
40,152
kWh
$606
96
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,223
Cost:
$3,065
$3,223 58,617 - - - - - - $3,223
58,617
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$944
Cost:
$1,500
$762 13,775 $182 29 - - - - $762
13,775
kWh
$182
29
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$451
Cost:
$100
- - - - $451 84 - - -
-
kWh
-
-
kW-months/year
$451
84
MMBtu
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$7,395
Cost:
$4,800
- - - - $7,395 1,385 - - -
-
kWh
-
-
kW-months/year
$7,395
1,385
MMBtu
-
-
$
06: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$14,628
Cost:
$8,000
- - - - $14,628 2,739 - - -
-
kWh
-
-
kW-months/year
$14,628
2,739
MMBtu
-
-
$
07: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$25,402
Cost:
$22,000
- - - - $25,402 4,757 - - -
-
kWh
-
-
kW-months/year
$25,402
4,757
MMBtu
-
-
$
08: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$10,000
Cost:
$35,000
- - - - - - $10,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,000
-
$
TOTAL RECOMMENDED Savings:
$64,861
Cost:
$82,241
$6,197 112,544 $788 125 $47,876 8,965 $10,000 - $6,197
112,544
kWh
$788
125
kW-months/year
$47,876
8,965
MMBtu
$10,000
-
$
TOTAL IMPLEMENTED Savings:
$13,436
Cost:
$15,641
$5,435 98,769 $606 96 $7,395 1,385 - - $5,435
98,769
kWh
$606
96
kW-months/year
$7,395
1,385
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost