IAC Assessment: HO0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1999
Principal Product Power Supplies
NAICS n/a
SIC 3612 - Transformers, Except Electronic
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 36,000
Annual Production 20,000 Pieces
Production Hrs. Annual 2,375
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,956 924,971 kWh $0.06
Electricity Demand $97,239 4,278 kW-months/year $22.73
Electricity Fees $6,213 - $ -
Natural Gas $26,246 3,147 MMBtu $8.34
TOTAL ENERGY COSTS $210,265
RECOMMENDED SAVINGS* $20,698 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $931
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$931
Cost:
-
$931 16,706 - - - - - - - - $931
16,706
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
02: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$400
Cost:
-
$400 7,034 - - - - - - - - $400
7,034
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$2,807
Cost:
$5,000
$925 16,413 $1,882 83 - - - - - - $925
16,413
kWh
$1,882
83
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
04: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$2,786
Cost:
$2,500
$2,420 82,063 $366 16 - - - - - - $2,420
82,063
kWh
$366
16
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
05: 4.3210 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$3,750
Cost:
$5,000
- - - - - - - - $3,750 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$3,750
-
$
06: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,813
Cost:
$360
- - - - - - - - $2,813 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$2,813
-
$
07: 4.6320 CHANGE OPERATING CONDITIONS Savings:
$899
Cost:
$1,040
- - - - - - - - $899 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$899
-
$
08: 3.4151 MINIMIZE WATER USAGE Savings:
$5,887
Cost:
$4,200
- - - - $5,887 - - - - - -
-
kWh
-
-
kW-months/year
$5,887
-
Tgal
-
-
lb
-
-
$
09: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$425
Cost:
-
- - - - - - $425 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$425
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$20,698
Cost:
$18,100
$4,676 122,216 $2,248 99 $5,887 - $425 - $7,462 - $4,676
122,216
kWh
$2,248
99
kW-months/year
$5,887
-
Tgal
$425
-
lb
$7,462
-
$
TOTAL IMPLEMENTED Savings:
$931
Cost:
-
$931 16,706 - - - - - - - - $931
16,706
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost