IAC logo
IAC Assessment: IA0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1991
Principal Product BAKED BREAD
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 8,736
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,628 1,216,002 kWh $0.06
Natural Gas $71,740 21,034 MMBtu $3.41
TOTAL ENERGY COSTS $141,368
RECOMMENDED SAVINGS* $17,631 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,631
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$9,855
Cost:
$21,600
- - $9,855 2,890 - - -
-
kWh
$9,855
2,890
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,583
Cost:
$2,375
$1,583 27,843 - - - - $1,583
27,843
kWh
-
-
MMBtu
-
-
$
03: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$1,884
Cost:
$6,800
- - $1,884 553 - - -
-
kWh
$1,884
553
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$286
Cost:
$395
$286 4,982 - - - - $286
4,982
kWh
-
-
MMBtu
-
-
$
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$3,302
Cost:
-
$1,055 18,464 - - $2,247 - $1,055
18,464
kWh
-
-
MMBtu
$2,247
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$721
Cost:
$945
$721 12,603 - - - - $721
12,603
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$17,631
Cost:
$32,115
$3,645 63,892 $11,739 3,443 $2,247 - $3,645
63,892
kWh
$11,739
3,443
MMBtu
$2,247
-
$
TOTAL IMPLEMENTED Savings:
$17,631
Cost:
$32,115
$3,645 63,892 $11,739 3,443 $2,247 - $3,645
63,892
kWh
$11,739
3,443
MMBtu
$2,247
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes