IAC logo
IAC Assessment: IA0020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1992
Principal Product HYDROSTATIC TRANSMISSION
NAICS n/a
SIC 3594 - Fluid Power Pumps And Motors
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 0
Annual Production 162,000 Pieces
Production Hrs. Annual 4,576
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $559,116 12,500,000 kWh $0.04
Natural Gas $63,848 23,870 MMBtu $2.67
TOTAL ENERGY COSTS $622,964
RECOMMENDED SAVINGS* $10,137 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,285
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,833
Cost:
$551
$6,386 143,025 - - $(-553) - $6,386
143,025
kWh
-
-
MMBtu
$(-553)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$223
Cost:
$412
$303 6,741 - - $(-80) - $303
6,741
kWh
-
-
MMBtu
$(-80)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$607
Cost:
$1,000
$607 13,482 - - - - $607
13,482
kWh
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,076
Cost:
$3,000
- - $2,076 778 - - -
-
kWh
$2,076
778
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$452
Cost:
$8,900
$452 10,258 - - - - $452
10,258
kWh
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$946
Cost:
$2,192
$946 21,102 - - - - $946
21,102
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,137
Cost:
$16,055
$8,694 194,608 $2,076 778 $(-633) - $8,694
194,608
kWh
$2,076
778
MMBtu
$(-633)
-
$
TOTAL IMPLEMENTED Savings:
$6,285
Cost:
$9,451
$6,838 153,283 - - $(-553) - $6,838
153,283
kWh
-
-
MMBtu
$(-553)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes