IAC logo
IAC Assessment: IA0024
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0024
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1992
Principal Product FUEL FILTERS
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 7,330,000 Pieces
Production Hrs. Annual 7,488
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,609 5,008,499 kWh $0.04
Natural Gas $43,161 10,811 MMBtu $3.99
TOTAL ENERGY COSTS $244,770
RECOMMENDED SAVINGS* $43,763 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,912
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,552
Cost:
$51,000
$(-787) (-19,637) $13,339 3,343 - - $(-787)
(-19,637)
kWh
$13,339
3,343
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,634
Cost:
$3,600
$271 6,741 $8,363 2,096 - - $271
6,741
kWh
$8,363
2,096
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,997
Cost:
$467
$3,464 86,166 - - $(-467) - $3,464
86,166
kWh
-
-
MMBtu
$(-467)
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$857
Cost:
$1,660
$857 21,395 - - - - $857
21,395
kWh
-
-
MMBtu
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$422
Cost:
$450
$422 10,551 - - - - $422
10,551
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,454
Cost:
$50
$9,454 234,760 - - - - $9,454
234,760
kWh
-
-
MMBtu
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,218
Cost:
$1,218
- - $2,218 556 - - -
-
kWh
$2,218
556
MMBtu
-
-
$
08: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$4,688
Cost:
$426
$4,688 116,354 - - - - $4,688
116,354
kWh
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,941
Cost:
$100
$1,941 48,359 - - - - $1,941
48,359
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$43,763
Cost:
$58,971
$20,310 504,689 $23,920 5,995 $(-467) - $20,310
504,689
kWh
$23,920
5,995
MMBtu
$(-467)
-
$
TOTAL IMPLEMENTED Savings:
$28,912
Cost:
$52,694
$13,355 331,477 $15,557 3,899 - - $13,355
331,477
kWh
$15,557
3,899
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes