IAC Assessment: IA0026
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0026
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1992
Principal Product PIZZA TOPPINGS
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 21,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,074 2,591,442 kWh $0.05
Natural Gas $134,666 32,058 MMBtu $4.20
TOTAL ENERGY COSTS $275,740
RECOMMENDED SAVINGS* $13,802 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,217
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$7,666
Cost:
$15
- - $7,666 1,825 - - -
-
kWh
$7,666
1,825
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$486
Cost:
$714
- - $486 116 - - -
-
kWh
$486
116
MMBtu
-
-
$
03: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$1,634
Cost:
$496
- - $1,634 389 - - -
-
kWh
$1,634
389
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$736
Cost:
$4,500
$736 13,189 - - - - $736
13,189
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,465
Cost:
$779
$3,277 59,203 - - $(-812) - $3,277
59,203
kWh
-
-
MMBtu
$(-812)
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$815
Cost:
$1,080
$815 14,654 - - - - $815
14,654
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$13,802
Cost:
$7,584
$4,828 87,046 $9,786 2,330 $(-812) - $4,828
87,046
kWh
$9,786
2,330
MMBtu
$(-812)
-
$
TOTAL IMPLEMENTED Savings:
$9,217
Cost:
$5,595
$1,551 27,843 $7,666 1,825 - - $1,551
27,843
kWh
$7,666
1,825
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes