IAC logo
IAC Assessment: IA0027
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0027
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1992
Principal Product ATHLETIC UNIFORMS
NAICS n/a
SIC 2329 - Men's and Boys' Clothing, Not Elsewhere Classified
Sales $5,000,000-$10,000,000
# of Employees 240
Plant Area (Sq.Ft.) 0
Annual Production 133,000 Pieces
Production Hrs. Annual 4,420
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,859 748,535 kWh $0.05
Natural Gas $28,486 7,242 MMBtu $3.93
TOTAL ENERGY COSTS $67,345
RECOMMENDED SAVINGS* $6,209 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,133
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,328
Cost:
$1,297
- - $1,328 338 - - -
-
kWh
$1,328
338
MMBtu
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$533
Cost:
$361
- - $533 136 - - -
-
kWh
$533
136
MMBtu
-
-
$
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$191
Cost:
$66
- - $191 49 - - -
-
kWh
$191
49
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,643
Cost:
$3,441
$2,643 50,996 - - - - $2,643
50,996
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$274
Cost:
$172
$655 12,603 - - $(-381) - $655
12,603
kWh
-
-
MMBtu
$(-381)
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$557
Cost:
$250
$557 10,844 - - - - $557
10,844
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$423
Cost:
$600
$423 8,206 - - - - $423
8,206
kWh
-
-
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$260
Cost:
$20
$260 4,982 - - - - $260
4,982
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$6,209
Cost:
$6,207
$4,538 87,631 $2,052 523 $(-381) - $4,538
87,631
kWh
$2,052
523
MMBtu
$(-381)
-
$
TOTAL IMPLEMENTED Savings:
$4,133
Cost:
$4,594
$3,981 76,787 $533 136 $(-381) - $3,981
76,787
kWh
$533
136
MMBtu
$(-381)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes