IAC logo
IAC Assessment: IA0064
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0064
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1993
Principal Product LOCOMOTIVE REMANUFACTURE
NAICS n/a
SIC 3519 - Internal Combustion Engines, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 612 Pieces
Production Hrs. Annual 2,668
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $175,352 2,207,503 kWh $0.08
Natural Gas $73,153 31,071 MMBtu $2.35
TOTAL ENERGY COSTS $248,505
RECOMMENDED SAVINGS* $60,998 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,813
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$33,534
Cost:
$4,388
$38,376 483,001 $(-4,842) (-2,061) - - $38,376
483,001
kWh
$(-4,842)
(-2,061)
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,716
Cost:
$648
$3,716 46,893 - - - - $3,716
46,893
kWh
-
-
MMBtu
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$13,920
Cost:
$6,676
$13,920 - - - - - $13,920
-
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,322
Cost:
$2,500
$4,322 54,513 - - - - $4,322
54,513
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,740
Cost:
$2,585
$4,832 60,961 - - $(-92) - $4,832
60,961
kWh
-
-
MMBtu
$(-92)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$297
Cost:
-
$377 4,689 - - $(-80) - $377
4,689
kWh
-
-
MMBtu
$(-80)
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$469
Cost:
$2,751
$469 5,862 - - - - $469
5,862
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$60,998
Cost:
$19,548
$66,012 655,919 $(-4,842) (-2,061) $(-172) - $66,012
655,919
kWh
$(-4,842)
(-2,061)
MMBtu
$(-172)
-
$
TOTAL IMPLEMENTED Savings:
$56,813
Cost:
$16,149
$61,827 603,164 $(-4,842) (-2,061) $(-172) - $61,827
603,164
kWh
$(-4,842)
(-2,061)
MMBtu
$(-172)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes