IAC logo
IAC Assessment: IA0065
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0065
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1993
Principal Product URETHANNE FOAM PRODUCTS
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 0
Annual Production 1,000,000 Pounds
Production Hrs. Annual 4,862
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $196,091 3,276,084 kWh $0.06
Natural Gas $34,834 8,249 MMBtu $4.22
TOTAL ENERGY COSTS $230,925
RECOMMENDED SAVINGS* $10,065 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,873
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$661
Cost:
$2,199
$661 11,137 - - - - $661
11,137
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,117
Cost:
-
$2,721 45,428 - - $(-604) - $2,721
45,428
kWh
-
-
MMBtu
$(-604)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$990
Cost:
$3,600
$990 16,413 - - - - $990
16,413
kWh
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$955
Cost:
$1,585
$955 15,826 - - - - $955
15,826
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$130
Cost:
$300
$130 2,052 - - - - $130
2,052
kWh
-
-
MMBtu
-
-
$
06: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$1,954
Cost:
$10,280
$1,954 33,411 - - - - $1,954
33,411
kWh
-
-
MMBtu
-
-
$
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,942
Cost:
$4,750
$(-581) (-9,672) $2,523 598 - - $(-581)
(-9,672)
kWh
$2,523
598
MMBtu
-
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,316
Cost:
$1,350
$528 8,792 $788 187 - - $528
8,792
kWh
$788
187
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,065
Cost:
$24,064
$7,358 123,387 $3,311 785 $(-604) - $7,358
123,387
kWh
$3,311
785
MMBtu
$(-604)
-
$
TOTAL IMPLEMENTED Savings:
$5,873
Cost:
$18,579
$2,562 43,668 $3,311 785 - - $2,562
43,668
kWh
$3,311
785
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes