IAC Assessment: IA0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1993
Principal Product PROCESSED HAM
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $100,000,000-$500,000,000
# of Employees 220
Plant Area (Sq.Ft.) 0
Annual Production 101,000,000 Pounds
Production Hrs. Annual 5,200
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $435,684 9,012,896 kWh $0.05
Natural Gas $204,373 75,241 MMBtu $2.72
TOTAL ENERGY COSTS $640,057
RECOMMENDED SAVINGS* $157,831 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,570
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$90,934
Cost:
$267,950
$111,958 2,696,366 $(-23,224) (-8,538) $2,200 - $111,958
2,696,366
kWh
$(-23,224)
(-8,538)
MMBtu
$2,200
-
$
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$42,651
Cost:
$56,888
$42,651 882,181 - - - - $42,651
882,181
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,851
Cost:
$4,308
$10,851 224,502 - - - - $10,851
224,502
kWh
-
-
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,822
Cost:
$7,616
- - $1,822 670 - - -
-
kWh
$1,822
670
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,747
Cost:
$20
$1,250 25,791 $497 183 - - $1,250
25,791
kWh
$497
183
MMBtu
-
-
$
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$585
Cost:
$500
- - $585 215 - - -
-
kWh
$585
215
MMBtu
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,637
Cost:
$1,000
$3,637 75,322 - - - - $3,637
75,322
kWh
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,476
Cost:
$200
$2,476 51,290 - - - - $2,476
51,290
kWh
-
-
MMBtu
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,037
Cost:
-
$1,689 34,877 - - $(-652) - $1,689
34,877
kWh
-
-
MMBtu
$(-652)
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,188
Cost:
$1,430
$1,188 24,619 - - - - $1,188
24,619
kWh
-
-
MMBtu
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$903
Cost:
$360
$903 18,757 - - - - $903
18,757
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$157,831
Cost:
$340,272
$176,603 4,033,705 $(-20,320) (-7,470) $1,548 - $176,603
4,033,705
kWh
$(-20,320)
(-7,470)
MMBtu
$1,548
-
$
TOTAL IMPLEMENTED Savings:
$21,570
Cost:
$13,144
$19,903 411,782 $2,319 853 $(-652) - $19,903
411,782
kWh
$2,319
853
MMBtu
$(-652)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes