Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1995 |
Principal Product | furniture |
NAICS | n/a |
SIC | 2511 - Wood Household Furniture |
Sales | $10,000,000-$50,000,000 |
# of Employees | 106 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 112,500 Pieces |
Production Hrs. Annual | 2,167 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $141,931 | 1,744,725 | kWh | $0.08 |
Natural Gas | $24,554 | 5,529 | MMBtu | $4.44 |
TOTAL ENERGY COSTS | $356,027 | |||
RECOMMENDED SAVINGS* | $39,809 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,600 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,241 Cost: $554 |
$2,241 | 27,550 | - | - | - | - | - | - |
$2,241 27,550 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $951 Cost: $2,159 |
$951 | 11,723 | - | - | - | - | - | - |
$951 11,723 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $736 Cost: $25 |
$736 | 9,086 | - | - | - | - | - | - |
$736 9,086 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $460 Cost: $25 |
$460 | 5,569 | - | - | - | - | - | - |
$460 5,569 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $681 Cost: $770 |
$681 | 8,499 | - | - | - | - | - | - |
$681 8,499 kWh |
- - MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $528 Cost: $2,010 |
- | - | $528 | 160 | - | - | - | - |
- - kWh |
$528 160 MMBtu |
- - lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $28,368 Cost: $1,100 |
- | - | - | - | - | - | $28,368 | - |
- - kWh |
- - MMBtu |
- - lb |
$28,368 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $4,875 Cost: $8,480 |
- | - | - | - | $4,875 | 100,000 | - | - |
- - kWh |
- - MMBtu |
$4,875 100,000 lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL |
Savings: $969 Cost: - |
- | - | - | - | $969 | 449 | - | - |
- - kWh |
- - MMBtu |
$969 449 lb |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,809 Cost: $15,123 |
$5,069 | 62,427 | $528 | 160 | $5,844 | 100,449 | $28,368 | - | $5,069 62,427 kWh |
$528 160 MMBtu |
$5,844 100,449 lb |
$28,368 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,600 Cost: $12,343 |
$4,388 | 53,928 | - | - | $5,844 | 100,449 | $28,368 | - | $4,388 53,928 kWh |
- - MMBtu |
$5,844 100,449 lb |
$28,368 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) |