IAC logo
IAC Assessment: IA0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1996
Principal Product paint
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 100,000
Annual Production 3,500 Thousand Gallons
Production Hrs. Annual 2,470
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,397 1,639,801 kWh $0.04
Electricity Demand $37,320 7,464 kW-months/year $5.00
Electricity Fees $8,694 - $ -
Natural Gas $17,470 8,800 MMBtu $1.99
TOTAL ENERGY COSTS $120,881
RECOMMENDED SAVINGS* $22,790 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,575
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,224
Cost:
$2,223
$1,300 37,222 $924 180 - - - - $1,300
37,222
kWh
$924
180
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$213
Cost:
$442
$126 3,517 $87 36 - - - - $126
3,517
kWh
$87
36
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$116
Cost:
$225
$68 2,052 $48 10 - - - - $68
2,052
kWh
$48
10
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$969
Cost:
$25
$573 16,413 $396 79 - - - - $573
16,413
kWh
$396
79
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$351
Cost:
$361
$195 5,569 $156 31 - - - - $195
5,569
kWh
$156
31
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$127
Cost:
$680
- - - - $127 64 - - -
-
kWh
-
-
kW-months/year
$127
64
MMBtu
-
-
lb
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$12,056
Cost:
$4,500
$5,900 168,523 $6,156 1,231 - - - - $5,900
168,523
kWh
$6,156
1,231
kW-months/year
-
-
MMBtu
-
-
lb
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,734
Cost:
$20,000
- - - - - - $6,734 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,734
-
lb
TOTAL RECOMMENDED Savings:
$22,790
Cost:
$28,456
$8,162 233,296 $7,767 1,567 $127 64 $6,734 - $8,162
233,296
kWh
$7,767
1,567
kW-months/year
$127
64
MMBtu
$6,734
-
lb
TOTAL IMPLEMENTED Savings:
$2,575
Cost:
$2,584
$1,495 42,791 $1,080 211 - - - - $1,495
42,791
kWh
$1,080
211
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)