Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1996 |
Principal Product | single row, deep groove ball bearings |
NAICS | n/a |
SIC | 3562 - Ball And Roller Bearings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 457 |
Plant Area (Sq.Ft.) | 267,000 |
Annual Production | 108,780,370 Pieces |
Production Hrs. Annual | 5,880 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $753,074 | 28,047,773 | kWh | $0.03 |
Electricity Demand | $320,675 | 55,320 | kW-months/year | $5.80 |
Electricity Fees | $80,559 | - | $ | - |
Natural Gas | $140,118 | 45,027 | MMBtu | $3.11 |
TOTAL ENERGY COSTS | $1,374,146 | |||
RECOMMENDED SAVINGS* | $150,910 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $26,018 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $27,015 Cost: $50 |
$19,547 | 651,524 | $7,468 | 1,288 | - | - | - | - |
$19,547 651,524 kWh |
$7,468 1,288 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,045 Cost: $420 |
$2,238 | 74,736 | $807 | 139 | - | - | - | - |
$2,238 74,736 kWh |
$807 139 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $43,340 Cost: $44,269 |
$23,288 | 776,378 | $20,052 | 3,457 | - | - | - | - |
$23,288 776,378 kWh |
$20,052 3,457 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $51,850 Cost: $100,800 |
- | - | - | - | - | - | $51,850 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$51,850 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $19,046 Cost: $65,284 |
$13,659 | 456,038 | $5,387 | 929 | - | - | - | - |
$13,659 456,038 kWh |
$5,387 929 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,407 Cost: $1,998 |
$990 | 36,635 | $417 | 72 | - | - | - | - |
$990 36,635 kWh |
$417 72 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,520 Cost: $7,060 |
$1,761 | 65,064 | $759 | 131 | - | - | - | - |
$1,761 65,064 kWh |
$759 131 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,764 Cost: $2,410 |
- | - | - | - | $1,764 | 844 | - | - |
- - kWh |
- - kW-months/year |
$1,764 844 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $923 Cost: $1,100 |
$(-108) | (-4,103) | $(-77) | (-13) | $1,108 | 530 | - | - |
$(-108) (-4,103) kWh |
$(-77) (-13) kW-months/year |
$1,108 530 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $150,910 Cost: $223,391 |
$61,375 | 2,056,272 | $34,813 | 6,003 | $2,872 | 1,374 | $51,850 | - | $61,375 2,056,272 kWh |
$34,813 6,003 kW-months/year |
$2,872 1,374 MMBtu |
$51,850 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $26,018 Cost: $74,762 |
$18,648 | 632,473 | $7,370 | 1,271 | - | - | - | - | $18,648 632,473 kWh |
$7,370 1,271 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |