IAC Assessment: IA0145
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0145
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1996
Principal Product single row, deep groove ball bearings
NAICS n/a
SIC 3562 - Ball And Roller Bearings
Sales $50,000,000-$100,000,000
# of Employees 457
Plant Area (Sq.Ft.) 267,000
Annual Production 108,780,370 Pieces
Production Hrs. Annual 5,880
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $753,074 28,047,773 kWh $0.03
Electricity Demand $320,675 55,320 kW-months/year $5.80
Electricity Fees $80,559 - $ -
Natural Gas $140,118 45,027 MMBtu $3.11
TOTAL ENERGY COSTS $1,374,146
RECOMMENDED SAVINGS* $150,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,018
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$27,015
Cost:
$50
$19,547 651,524 $7,468 1,288 - - - - $19,547
651,524
kWh
$7,468
1,288
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,045
Cost:
$420
$2,238 74,736 $807 139 - - - - $2,238
74,736
kWh
$807
139
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$43,340
Cost:
$44,269
$23,288 776,378 $20,052 3,457 - - - - $23,288
776,378
kWh
$20,052
3,457
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$51,850
Cost:
$100,800
- - - - - - $51,850 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$51,850
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$19,046
Cost:
$65,284
$13,659 456,038 $5,387 929 - - - - $13,659
456,038
kWh
$5,387
929
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,407
Cost:
$1,998
$990 36,635 $417 72 - - - - $990
36,635
kWh
$417
72
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,520
Cost:
$7,060
$1,761 65,064 $759 131 - - - - $1,761
65,064
kWh
$759
131
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,764
Cost:
$2,410
- - - - $1,764 844 - - -
-
kWh
-
-
kW-months/year
$1,764
844
MMBtu
-
-
Tgal
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$923
Cost:
$1,100
$(-108) (-4,103) $(-77) (-13) $1,108 530 - - $(-108)
(-4,103)
kWh
$(-77)
(-13)
kW-months/year
$1,108
530
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$150,910
Cost:
$223,391
$61,375 2,056,272 $34,813 6,003 $2,872 1,374 $51,850 - $61,375
2,056,272
kWh
$34,813
6,003
kW-months/year
$2,872
1,374
MMBtu
$51,850
-
Tgal
TOTAL IMPLEMENTED Savings:
$26,018
Cost:
$74,762
$18,648 632,473 $7,370 1,271 - - - - $18,648
632,473
kWh
$7,370
1,271
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal