IAC Assessment: IA0172
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0172
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1997
Principal Product metal doors
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $50,000,000-$100,000,000
# of Employees 270
Plant Area (Sq.Ft.) 134,000
Annual Production 450,000 Pieces
Production Hrs. Annual 6,000
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,419 1,522,861 kWh $0.03
Electricity Demand $23,873 3,252 kW-months/year $7.34
TOTAL ENERGY COSTS $63,292
RECOMMENDED SAVINGS* $224,543 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $101,637
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material By-product Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$120,000
Cost:
$150,000
- - - - $120,000 - - - - - - - -
-
kWh
-
-
kW-months/year
$120,000
-
$
-
-
$
-
-
$
-
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$90,720
Cost:
$10,000
- - - - - - - - $145,800 - $(-55,080) - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$145,800
-
$
$(-55,080)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,126
Cost:
$17,669
$5,126 201,055 - - - - - - - - - - $5,126
201,055
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,906
Cost:
$7,400
- - - - $(-2,250) - $5,156 - - - - - -
-
kWh
-
-
kW-months/year
$(-2,250)
-
$
$5,156
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,649
Cost:
$743
$1,700 65,358 $949 131 - - - - - - - - $1,700
65,358
kWh
$949
131
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,326
Cost:
$10,347
$(-78) (-2,931) $(-131) (-18) - - $2,535 - - - - - $(-78)
(-2,931)
kWh
$(-131)
(-18)
kW-months/year
-
-
$
$2,535
-
$
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$654
Cost:
$162
$451 17,292 $203 34 - - - - - - - - $451
17,292
kWh
$203
34
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$162
Cost:
$200
$101 3,810 $61 8 - - - - - - - - $101
3,810
kWh
$61
8
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$224,543
Cost:
$196,521
$7,300 284,584 $1,082 155 $117,750 - $7,691 - $145,800 - $(-55,080) - $7,300
284,584
kWh
$1,082
155
kW-months/year
$117,750
-
$
$7,691
-
$
$145,800
-
$
$(-55,080)
-
$
TOTAL IMPLEMENTED Savings:
$101,637
Cost:
$39,121
$7,300 284,584 $1,082 155 - - $2,535 - $145,800 - $(-55,080) - $7,300
284,584
kWh
$1,082
155
kW-months/year
-
-
$
$2,535
-
$
$145,800
-
$
$(-55,080)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Primary Raw Material By-product Production