IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1998
Principal Product fibrous wood products
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 20
Plant Area (Sq.Ft.) 24,000
Annual Production 30,000 Tons
Production Hrs. Annual 5,824
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,245 3,167,644 kWh $0.05
Electricity Demand $55,554 8,544 kW-months/year $6.50
Natural Gas $6,337 1,108 MMBtu $5.72
TOTAL ENERGY COSTS $231,872
RECOMMENDED SAVINGS* $133,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,519
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes By-product Production
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,409
Cost:
$10,225
$5,546 104,924 $1,863 224 - - - - - - - - $5,546
104,924
kWh
$1,863
224
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,330
Cost:
$2,729
$872 16,413 $458 555 - - - - - - - - $872
16,413
kWh
$458
555
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$831
Cost:
$599
$831 15,826 - - - - - - - - - - $831
15,826
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$218
Cost:
$39
$168 2,345 $50 5 - - - - - - - - $168
2,345
kWh
$50
5
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$478
Cost:
$184
$358 6,741 $120 14 - - - - - - - - $358
6,741
kWh
$120
14
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
06: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$2,047
Cost:
$1,140
$(-229) (-4,396) $(-74) (-9) - - $400 - $1,950 - - - $(-229)
(-4,396)
kWh
$(-74)
(-9)
kW-months/year
-
-
$
$400
-
lb
$1,950
-
$
-
-
$
07: 4.1120 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$59,854
Cost:
$120,000
$29,361 556,272 $(-707) (-85) - - - - $31,200 - - - $29,361
556,272
kWh
$(-707)
(-85)
kW-months/year
-
-
$
-
-
lb
$31,200
-
$
-
-
$
08: 2.8211 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES Savings:
$39,936
Cost:
$500
- - - - - - $(-10,400) - $(-5,200) - $55,536 - -
-
kWh
-
-
kW-months/year
-
-
$
$(-10,400)
-
lb
$(-5,200)
-
$
$55,536
-
$
09: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,040
Cost:
$50
- - - - $11,040 - - - - - - - -
-
kWh
-
-
kW-months/year
$11,040
-
$
-
-
lb
-
-
$
-
-
$
10: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$10,327
Cost:
$250
- - - - $10,327 - - - - - - - -
-
kWh
-
-
kW-months/year
$10,327
-
$
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$133,470
Cost:
$135,716
$36,907 698,125 $1,710 704 $21,367 - $(-10,000) - $27,950 - $55,536 - $36,907
698,125
kWh
$1,710
704
kW-months/year
$21,367
-
$
$(-10,000)
-
lb
$27,950
-
$
$55,536
-
$
TOTAL IMPLEMENTED Savings:
$31,519
Cost:
$11,888
$5,843 109,614 $1,959 234 $21,367 - $400 - $1,950 - - - $5,843
109,614
kWh
$1,959
234
kW-months/year
$21,367
-
$
$400
-
lb
$1,950
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes By-product Production