IAC logo
IAC Assessment: IA0208
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0208
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1998
Principal Product custom livestock and snowmobile trailers
NAICS n/a
SIC 3799 - Transportation Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 80,000
Annual Production 3,300 Pieces
Production Hrs. Annual 2,210
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,993 1,024,033 kWh $0.04
Electricity Demand $12,702 3,720 kW-months/year $3.41
Natural Gas $42,207 9,809 MMBtu $4.30
TOTAL ENERGY COSTS $111,718
RECOMMENDED SAVINGS* $245,655 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $244,563
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,845
Cost:
$495
$3,815 153,869 $1,030 211 - - - - - - $3,815
153,869
kWh
$1,030
211
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,757
Cost:
-
$4,757 191,970 - - - - - - - - $4,757
191,970
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,597
Cost:
$50
$1,257 50,703 $340 70 - - - - - - $1,257
50,703
kWh
$340
70
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,092
Cost:
$1,250
$1,092 43,962 - - - - - - - - $1,092
43,962
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$187
Cost:
$434
$99 4,103 $88 18 - - - - - - $99
4,103
kWh
$88
18
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$47
Cost:
$92
$23 879 $24 5 - - - - - - $23
879
kWh
$24
5
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$74,010
Cost:
$2,000
- - - - $6,308 4,350 - - $67,702 - -
-
kWh
-
-
kW-months/year
$6,308
4,350
lb
-
-
$
$67,702
-
$
08: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$159,120
Cost:
$82,800
- - - - - - $159,120 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$159,120
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$245,655
Cost:
$87,121
$11,043 445,486 $1,482 304 $6,308 4,350 $159,120 - $67,702 - $11,043
445,486
kWh
$1,482
304
kW-months/year
$6,308
4,350
lb
$159,120
-
$
$67,702
-
$
TOTAL IMPLEMENTED Savings:
$244,563
Cost:
$85,871
$9,951 401,524 $1,482 304 $6,308 4,350 $159,120 - $67,702 - $9,951
401,524
kWh
$1,482
304
kW-months/year
$6,308
4,350
lb
$159,120
-
$
$67,702
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (haz) Personnel Changes Ancillary Material Cost