Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1998 |
Principal Product | custom livestock and snowmobile trailers |
NAICS | n/a |
SIC | 3799 - Transportation Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 3,300 Pieces |
Production Hrs. Annual | 2,210 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $35,993 | 1,024,033 | kWh | $0.04 |
Electricity Demand | $12,702 | 3,720 | kW-months/year | $3.41 |
Natural Gas | $42,207 | 9,809 | MMBtu | $4.30 |
TOTAL ENERGY COSTS | $111,718 | |||
RECOMMENDED SAVINGS* | $245,655 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $244,563 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,845 Cost: $495 |
$3,815 | 153,869 | $1,030 | 211 | - | - | - | - | - | - |
$3,815 153,869 kWh |
$1,030 211 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $4,757 Cost: - |
$4,757 | 191,970 | - | - | - | - | - | - | - | - |
$4,757 191,970 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,597 Cost: $50 |
$1,257 | 50,703 | $340 | 70 | - | - | - | - | - | - |
$1,257 50,703 kWh |
$340 70 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,092 Cost: $1,250 |
$1,092 | 43,962 | - | - | - | - | - | - | - | - |
$1,092 43,962 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $187 Cost: $434 |
$99 | 4,103 | $88 | 18 | - | - | - | - | - | - |
$99 4,103 kWh |
$88 18 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $47 Cost: $92 |
$23 | 879 | $24 | 5 | - | - | - | - | - | - |
$23 879 kWh |
$24 5 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $74,010 Cost: $2,000 |
- | - | - | - | $6,308 | 4,350 | - | - | $67,702 | - |
- - kWh |
- - kW-months/year |
$6,308 4,350 lb |
- - $ |
$67,702 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.7214 REDUCE OR ELIMINATE WASTE |
Savings: $159,120 Cost: $82,800 |
- | - | - | - | - | - | $159,120 | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$159,120 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $245,655 Cost: $87,121 |
$11,043 | 445,486 | $1,482 | 304 | $6,308 | 4,350 | $159,120 | - | $67,702 | - | $11,043 445,486 kWh |
$1,482 304 kW-months/year |
$6,308 4,350 lb |
$159,120 - $ |
$67,702 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $244,563 Cost: $85,871 |
$9,951 | 401,524 | $1,482 | 304 | $6,308 | 4,350 | $159,120 | - | $67,702 | - | $9,951 401,524 kWh |
$1,482 304 kW-months/year |
$6,308 4,350 lb |
$159,120 - $ |
$67,702 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost |