IAC Assessment: IA0234
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0234
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1999
Principal Product labels
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 119
Plant Area (Sq.Ft.) 112,683
Annual Production 20,000 Thousand Feet
Production Hrs. Annual 5,000
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,889 4,235,932 kWh $0.03
Electricity Demand $91,987 13,140 kW-months/year $7.00
Natural Gas $16,457 4,825 MMBtu $3.41
TOTAL ENERGY COSTS $233,459
RECOMMENDED SAVINGS* $77,324 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,333
Cost:
$113
$688 27,843 $5,645 67 - - - - $688
27,843
kWh
$5,645
67
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,966
Cost:
$23,033
$2,925 117,819 $2,041 292 - - - - $2,925
117,819
kWh
$2,041
292
kW-months/year
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,948
Cost:
$4,194
$3,546 471,278 $2,402 343 - - - - $3,546
471,278
kWh
$2,402
343
kW-months/year
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,489
Cost:
$2,328
$1,489 60,082 - - - - - - $1,489
60,082
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$624
Cost:
$215
$372 14,947 $252 36 - - - - $372
14,947
kWh
$252
36
kW-months/year
-
-
$
-
-
$
06: 3.1194 USE AUTOMATIC FLOW CONTROL Savings:
$57,964
Cost:
$70,000
$4,390 177,022 $2,974 425 $16,200 - $34,400 - $4,390
177,022
kWh
$2,974
425
kW-months/year
$16,200
-
$
$34,400
-
$
TOTAL RECOMMENDED Savings:
$77,324
Cost:
$99,883
$13,410 868,991 $13,314 1,163 $16,200 - $34,400 - $13,410
868,991
kWh
$13,314
1,163
kW-months/year
$16,200
-
$
$34,400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Personnel Changes Primary Raw Material