IAC logo
IAC Assessment: IA0235
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0235
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1999
Principal Product fluid milk
NAICS n/a
SIC 2026 - Fluid Milk
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 100,000
Annual Production 17,100 Thousand Gallons
Production Hrs. Annual 6,240
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,290 5,832,943 kWh $0.03
Electricity Demand $83,017 13,980 kW-months/year $5.94
Natural Gas $21,174 6,927 MMBtu $3.06
TOTAL ENERGY COSTS $338,824
RECOMMENDED SAVINGS* $44,836 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,381
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ Tgal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,832
Cost:
-
$5,885 254,982 $3,947 392 - - - - - - - - - - - - $5,885
254,982
kWh
$3,947
392
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,453
Cost:
$265
$1,330 57,737 $1,123 112 - - - - - - - - - - - - $1,330
57,737
kWh
$1,123
112
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,066
Cost:
$25
$1,124 48,652 $942 94 - - - - - - - - - - - - $1,124
48,652
kWh
$942
94
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$554
Cost:
$43
$301 13,189 $253 25 - - - - - - - - - - - - $301
13,189
kWh
$253
25
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,522
Cost:
$9,183
$1,639 70,926 $1,883 187 - - - - - - - - - - - - $1,639
70,926
kWh
$1,883
187
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,864
Cost:
-
$2,438 70,926 $2,426 358 - - - - - - - - - - - - $2,438
70,926
kWh
$2,426
358
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$453
Cost:
$665
$453 19,637 - - - - - - - - - - - - - - $453
19,637
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
08: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$431
Cost:
$650
- - - - $431 141 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$431
141
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
09: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$15,177
Cost:
$11,511
$(-1,260) (-15,989) $(-1,055) (-105) - - $11,089 4,936,836 - - - - $6,403 - - - $(-1,260)
(-15,989)
kWh
$(-1,055)
(-105)
kW-months/year
-
-
MMBtu
$11,089
4,936,836
Tgal
-
-
lb
-
-
$
$6,403
-
Tgal
-
-
$
10: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$995
Cost:
$1,046
- - - - - - $631 280,800 - - - - - - $364 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$631
280,800
Tgal
-
-
lb
-
-
$
-
-
Tgal
$364
-
$
11: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$1,915
Cost:
$100
- - - - - - - - $1,735 14,400 $180 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,735
14,400
lb
$180
-
$
-
-
Tgal
-
-
$
12: 4.2310 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$2,574
Cost:
$3,900
- - - - - - - - - - $2,574 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$2,574
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$44,836
Cost:
$27,388
$11,910 520,060 $9,519 1,063 $431 141 $11,720 5,217,636 $1,735 14,400 $2,754 - $6,403 - $364 - $11,910
520,060
kWh
$9,519
1,063
kW-months/year
$431
141
MMBtu
$11,720
5,217,636
Tgal
$1,735
14,400
lb
$2,754
-
$
$6,403
-
Tgal
$364
-
$
TOTAL IMPLEMENTED Savings:
$11,381
Cost:
$1,089
$6,186 268,171 $4,200 417 - - $631 280,800 - - - - - - $364 - $6,186
268,171
kWh
$4,200
417
kW-months/year
-
-
MMBtu
$631
280,800
Tgal
-
-
lb
-
-
$
-
-
Tgal
$364
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Water Consumption One-time Revenue or Avoided Cost