Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1999 |
Principal Product | fluid milk |
NAICS | n/a |
SIC | 2026 - Fluid Milk |
Sales | $10,000,000-$50,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 17,100 Thousand Gallons |
Production Hrs. Annual | 6,240 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $201,290 | 5,832,943 | kWh | $0.03 |
Electricity Demand | $83,017 | 13,980 | kW-months/year | $5.94 |
Natural Gas | $21,174 | 6,927 | MMBtu | $3.06 |
TOTAL ENERGY COSTS | $338,824 | |||
RECOMMENDED SAVINGS* | $44,836 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,381 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Water Consumption | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Water Consumption | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $9,832 Cost: - |
$5,885 | 254,982 | $3,947 | 392 | - | - | - | - | - | - | - | - | - | - | - | - |
$5,885 254,982 kWh |
$3,947 392 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,453 Cost: $265 |
$1,330 | 57,737 | $1,123 | 112 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,330 57,737 kWh |
$1,123 112 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,066 Cost: $25 |
$1,124 | 48,652 | $942 | 94 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,124 48,652 kWh |
$942 94 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $554 Cost: $43 |
$301 | 13,189 | $253 | 25 | - | - | - | - | - | - | - | - | - | - | - | - |
$301 13,189 kWh |
$253 25 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,522 Cost: $9,183 |
$1,639 | 70,926 | $1,883 | 187 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,639 70,926 kWh |
$1,883 187 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,864 Cost: - |
$2,438 | 70,926 | $2,426 | 358 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,438 70,926 kWh |
$2,426 358 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $453 Cost: $665 |
$453 | 19,637 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$453 19,637 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $431 Cost: $650 |
- | - | - | - | $431 | 141 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$431 141 MMBtu |
- - Tgal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $15,177 Cost: $11,511 |
$(-1,260) | (-15,989) | $(-1,055) | (-105) | - | - | $11,089 | 4,936,836 | - | - | - | - | $6,403 | - | - | - |
$(-1,260) (-15,989) kWh |
$(-1,055) (-105) kW-months/year |
- - MMBtu |
$11,089 4,936,836 Tgal |
- - lb |
- - $ |
$6,403 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $995 Cost: $1,046 |
- | - | - | - | - | - | $631 | 280,800 | - | - | - | - | - | - | $364 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$631 280,800 Tgal |
- - lb |
- - $ |
- - Tgal |
$364 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $1,915 Cost: $100 |
- | - | - | - | - | - | - | - | $1,735 | 14,400 | $180 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$1,735 14,400 lb |
$180 - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING |
Savings: $2,574 Cost: $3,900 |
- | - | - | - | - | - | - | - | - | - | $2,574 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$2,574 - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $44,836 Cost: $27,388 |
$11,910 | 520,060 | $9,519 | 1,063 | $431 | 141 | $11,720 | 5,217,636 | $1,735 | 14,400 | $2,754 | - | $6,403 | - | $364 | - | $11,910 520,060 kWh |
$9,519 1,063 kW-months/year |
$431 141 MMBtu |
$11,720 5,217,636 Tgal |
$1,735 14,400 lb |
$2,754 - $ |
$6,403 - Tgal |
$364 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,381 Cost: $1,089 |
$6,186 | 268,171 | $4,200 | 417 | - | - | $631 | 280,800 | - | - | - | - | - | - | $364 | - | $6,186 268,171 kWh |
$4,200 417 kW-months/year |
- - MMBtu |
$631 280,800 Tgal |
- - lb |
- - $ |
- - Tgal |
$364 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Water Consumption | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Water Consumption | One-time Revenue or Avoided Cost |