IAC logo
IAC Assessment: IA0243
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0243
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2000
Principal Product athletic socks
NAICS n/a
SIC 2252 - Hosiery, Nec
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 150,000
Annual Production 19,200,000 Pieces
Production Hrs. Annual 6,240
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,200 6,856,975 kWh $0.03
Electricity Demand $65,820 16,416 kW-months/year $4.01
Natural Gas $88,445 25,000 MMBtu $3.54
TOTAL ENERGY COSTS $358,130
RECOMMENDED SAVINGS* $18,881 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,527
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,163
Cost:
$616
$3,267 116,354 $896 223 - - - - $3,267
116,354
kWh
$896
223
kW-months/year
-
-
Tgal
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,274
Cost:
$50
$999 35,463 $275 68 - - - - $999
35,463
kWh
$275
68
kW-months/year
-
-
Tgal
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,742
Cost:
-
$1,366 48,652 $376 94 - - - - $1,366
48,652
kWh
$376
94
kW-months/year
-
-
Tgal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,660
Cost:
$2,661
$2,087 74,150 $573 143 - - - - $2,087
74,150
kWh
$573
143
kW-months/year
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,229
Cost:
-
$964 34,291 $265 66 - - - - $964
34,291
kWh
$265
66
kW-months/year
-
-
Tgal
-
-
$
06: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$4,393
Cost:
$4,718
- - - - $4,393 928,269 - - -
-
kWh
-
-
kW-months/year
$4,393
928,269
Tgal
-
-
$
07: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$3,420
Cost:
$2,950
- - - - - - $3,420 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$3,420
-
$
TOTAL RECOMMENDED Savings:
$18,881
Cost:
$10,995
$8,683 308,910 $2,385 594 $4,393 928,269 $3,420 - $8,683
308,910
kWh
$2,385
594
kW-months/year
$4,393
928,269
Tgal
$3,420
-
$
TOTAL IMPLEMENTED Savings:
$11,527
Cost:
$5,334
$5,597 199,297 $1,537 383 $4,393 928,269 - - $5,597
199,297
kWh
$1,537
383
kW-months/year
$4,393
928,269
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Ancillary Material Cost