IAC logo
IAC Assessment: IA0245
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0245
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2000
Principal Product molded thermoplastic parts
NAICS n/a
SIC 3083 - Laminated Plastics Plate & Sheet
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 40,000
Annual Production 1,200 Tons
Production Hrs. Annual 4,600
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $128,107 2,058,031 kWh $0.06
Electricity Demand $47,453 6,324 kW-months/year $7.50
Natural Gas $1,416 283 MMBtu $5.00
TOTAL ENERGY COSTS $179,296
RECOMMENDED SAVINGS* $105,174 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $98,489
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,446
Cost:
-
$2,007 64,771 $1,439 192 - - - - - - $2,007
64,771
kWh
$1,439
192
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,424
Cost:
$3,164
$734 23,740 $690 92 - - - - - - $734
23,740
kWh
$690
92
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$791
Cost:
-
$485 15,533 $306 41 - - - - - - $485
15,533
kWh
$306
41
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$186
Cost:
$25
$114 3,810 $72 10 - - - - - - $114
3,810
kWh
$72
10
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$142
Cost:
$335
$88 2,931 $54 7 - - - - - - $88
2,931
kWh
$54
7
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$114
Cost:
$113
$70 2,345 $44 6 - - - - - - $70
2,345
kWh
$44
6
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$97,398
Cost:
$100,000
$(-1,558) (-50,117) $(-6,025) (-804) $104,981 299,730 - - - - $(-1,558)
(-50,117)
kWh
$(-6,025)
(-804)
kW-months/year
$104,981
299,730
lb
-
-
$
-
-
$
08: 4.2210 USE ONLY AMOUNT OF PACKAGING MATERIAL NECESSARY Savings:
$1,500
Cost:
$6,500
- - - - - - $1,500 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,500
-
$
-
-
$
09: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$173
Cost:
-
- - - - - - - - $173 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$173
-
$
TOTAL RECOMMENDED Savings:
$105,174
Cost:
$110,137
$1,940 63,013 $(-3,420) (-456) $104,981 299,730 $1,500 - $173 - $1,940
63,013
kWh
$(-3,420)
(-456)
kW-months/year
$104,981
299,730
lb
$1,500
-
$
$173
-
$
TOTAL IMPLEMENTED Savings:
$98,489
Cost:
$100,138
$(-889) (-28,429) $(-5,603) (-747) $104,981 299,730 - - - - $(-889)
(-28,429)
kWh
$(-5,603)
(-747)
kW-months/year
$104,981
299,730
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Raw Material Ancillary Material Cost