IAC logo
IAC Assessment: IA0246
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0246
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2000
Principal Product cardboard containers
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $5,000,000-$10,000,000
# of Employees 125
Plant Area (Sq.Ft.) 275,000
Annual Production 9,000 Tons
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,141 1,811,841 kWh $0.04
Electricity Demand $67,952 9,024 kW-months/year $7.53
Natural Gas $9,857 2,152 MMBtu $4.58
TOTAL ENERGY COSTS $144,577
RECOMMENDED SAVINGS* $47,381 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,858
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$19,500
Cost:
$22,000
- - - - - - $19,500 - -
-
kWh
-
-
kW-months/year
-
-
$
$19,500
-
$
02: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$18,200
Cost:
$10,275
- - - - $18,200 - - - -
-
kWh
-
-
kW-months/year
$18,200
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,060
Cost:
-
$2,193 60,375 $867 116 - - - - $2,193
60,375
kWh
$867
116
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,799
Cost:
$202
$2,723 74,736 $1,076 144 - - - - $2,723
74,736
kWh
$1,076
144
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,999
Cost:
-
$1,431 39,273 $568 76 - - - - $1,431
39,273
kWh
$568
76
kW-months/year
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$445
Cost:
$25
$318 8,792 $127 17 - - - - $318
8,792
kWh
$127
17
kW-months/year
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$378
Cost:
$56
$279 7,620 $99 14 - - - - $279
7,620
kWh
$99
14
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$47,381
Cost:
$32,558
$6,944 190,796 $2,737 367 $18,200 - $19,500 - $6,944
190,796
kWh
$2,737
367
kW-months/year
$18,200
-
$
$19,500
-
$
TOTAL IMPLEMENTED Savings:
$8,858
Cost:
$202
$6,347 174,384 $2,511 336 - - - - $6,347
174,384
kWh
$2,511
336
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes