IAC Assessment: IA0268
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0268
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2001
Principal Product plastic bucket containers & lids
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 176
Plant Area (Sq.Ft.) 80,000
Annual Production 32,000,000 Pounds
Production Hrs. Annual 8,640
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $595,888 17,647,000 kWh $0.03
Electricity Demand $162,626 32,520 kW-months/year $5.00
Natural Gas $28,396 3,195 MMBtu $8.89
TOTAL ENERGY COSTS $786,910
RECOMMENDED SAVINGS* $941,370 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $344,338
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$44,140
Cost:
$200
- - - - - - - - $44,140 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$44,140
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$16,943
Cost:
$34,265
- - - - $16,943 - - - - - - - -
-
kWh
-
-
kW-months/year
$16,943
-
$
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,481
Cost:
$120
$5,952 216,431 $2,529 301 - - - - - - - - $5,952
216,431
kWh
$2,529
301
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,757
Cost:
$155
$1,930 70,190 $827 98 - - - - - - - - $1,930
70,190
kWh
$827
98
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$524
Cost:
$55
$368 13,392 $156 19 - - - - - - - - $368
13,392
kWh
$156
19
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,626
Cost:
$7,637
$1,396 50,763 $1,230 146 - - - - - - - - $1,396
50,763
kWh
$1,230
146
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,233
Cost:
$804
- - $2,233 57,103 - - - - - - - - -
-
kWh
$2,233
57,103
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,607
Cost:
$2,580
$989 35,953 $618 74 - - - - - - - - $989
35,953
kWh
$618
74
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$471
Cost:
$791
$471 17,127 - - - - - - - - - - $471
17,127
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$836
Cost:
$145
$584 21,222 $252 30 - - - - - - - - $584
21,222
kWh
$252
30
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
11: 3.7134 WASH AND REUSE RAGS ON-SITE Savings:
$18,352
Cost:
$108
- - - - - - $18,352 38,400 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$18,352
38,400
lb
-
-
$
-
-
$
12: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$482,780
Cost:
$42,000
- - - - - - - - - - $482,780 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
$482,780
-
$
13: 4.446 AUTOMATE FINISHING PROCESS Savings:
$285,120
Cost:
$140,000
- - - - - - - - - - $285,120 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
$285,120
-
$
14: 4.446 AUTOMATE FINISHING PROCESS Savings:
$58,660
Cost:
$35,260
- - - - - - - - - - $58,660 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
$58,660
-
$
15: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$15,840
Cost:
$78,673
- - - - - - - - - - $15,840 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
$15,840
-
$
TOTAL RECOMMENDED Savings:
$941,370
Cost:
$342,793
$11,690 425,078 $7,845 57,771 $16,943 - $18,352 38,400 $44,140 - $842,400 - $11,690
425,078
kWh
$7,845
57,771
kW-months/year
$16,943
-
$
$18,352
38,400
lb
$44,140
-
$
$842,400
-
$
TOTAL IMPLEMENTED Savings:
$344,338
Cost:
$143,859
$8,871 322,574 $6,207 57,576 - - - - $44,140 - $285,120 - $8,871
322,574
kWh
$6,207
57,576
kW-months/year
-
-
$
-
-
lb
$44,140
-
$
$285,120
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Primary Product