Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2001
Principal Product plastic consumer products for home use
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 675,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,006,166 39,676,000 kWh $0.03
Electricity Demand $381,241 75,780 kW-months/year $5.03
Natural Gas $191,710 25,774 MMBtu $7.44
TOTAL ENERGY COSTS $1,601,408
RECOMMENDED SAVINGS* $176,079 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$32,729
Cost:
-
$23,901 940,992 $8,828 1,810 - - - - $23,901
940,992
kWh
$8,828
1,810
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,244
Cost:
$407
$7,481 294,524 $2,763 566 - - - - $7,481
294,524
kWh
$2,763
566
kW-months/year
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,906
Cost:
$222
$1,391 54,752 $515 106 - - - - $1,391
54,752
kWh
$515
106
kW-months/year
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,703
Cost:
$19,781
$8,703 342,629 - - - - - - $8,703
342,629
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,749
Cost:
$15,786
$5,180 203,952 $1,569 322 - - - - $5,180
203,952
kWh
$1,569
322
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,228
Cost:
-
$4,139 162,936 $1,089 223 - - - - $4,139
162,936
kWh
$1,089
223
kW-months/year
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,150
Cost:
$1,463
$2,150 84,647 - - - - - - $2,150
84,647
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,055
Cost:
$12,857
$4,422 174,096 $1,633 335 - - - - $4,422
174,096
kWh
$1,633
335
kW-months/year
-
-
$
-
-
$
09: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$98,343
Cost:
$250,000
- - - - $98,343 - - - -
-
kWh
-
-
kW-months/year
$98,343
-
$
-
-
$
10: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$3,200
Cost:
$7,900
- - - - $3,200 - - - -
-
kWh
-
-
kW-months/year
$3,200
-
$
-
-
$
11: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$772
Cost:
$1,940
- - - - - - $772 - -
-
kWh
-
-
kW-months/year
-
-
$
$772
-
$
TOTAL RECOMMENDED Savings:
$176,079
Cost:
$310,356
$57,367 2,258,528 $16,397 3,362 $101,543 - $772 - $57,367
2,258,528
kWh
$16,397
3,362
kW-months/year
$101,543
-
$
$772
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes One-time Revenue or Avoided Cost