IAC logo
IAC Assessment: IA0283
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0283
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2001
Principal Product Folding cartons
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 72,000
Annual Production 20,000 Tons
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,727 2,715,549 kWh $0.03
Electricity Demand $55,030 7,200 kW-months/year $7.64
Natural Gas $102,807 11,794 MMBtu $8.72
TOTAL ENERGY COSTS $256,888
RECOMMENDED SAVINGS* $745,767 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $213,072
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$878
Cost:
$258
$588 17,347 $290 33 - - - - - - $588
17,347
kWh
$290
33
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$569
Cost:
$34
$381 11,232 $188 22 - - - - - - $381
11,232
kWh
$188
22
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,046
Cost:
$509
$1,369 40,375 $677 78 - - - - - - $1,369
40,375
kWh
$677
78
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,741
Cost:
-
$1,168 34,446 $573 66 - - - - - - $1,168
34,446
kWh
$573
66
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,401
Cost:
$12,898
$3,378 99,644 $2,023 233 - - - - - - $3,378
99,644
kWh
$2,023
233
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$543
Cost:
-
$364 10,727 $179 21 - - - - - - $364
10,727
kWh
$179
21
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$354
Cost:
$17
- - $354 41 - - - - - - -
-
kWh
$354
41
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.1222 INSTALL TURBULATORS Savings:
$982
Cost:
$912
- - - - $982 125 - - - - -
-
kWh
-
-
kW-months/year
$982
125
MMBtu
-
-
$
-
-
$
09: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$207,700
Cost:
$60,000
$(-719) (-21,216) $(-354) (-41) - - $208,773 - - - $(-719)
(-21,216)
kWh
$(-354)
(-41)
kW-months/year
-
-
MMBtu
$208,773
-
$
-
-
$
10: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$409,465
Cost:
$900,000
$(-4,261) (-125,686) $(-2,094) (-241) - - $415,820 - - - $(-4,261)
(-125,686)
kWh
$(-2,094)
(-241)
kW-months/year
-
-
MMBtu
$415,820
-
$
-
-
$
11: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$89,568
Cost:
$135,000
- - - - - - $50,400 - $39,168 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$50,400
-
$
$39,168
-
$
12: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$26,520
Cost:
$55,500
- - - - - - $26,520 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$26,520
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$745,767
Cost:
$1,165,128
$2,268 66,869 $1,836 212 $982 125 $701,513 - $39,168 - $2,268
66,869
kWh
$1,836
212
kW-months/year
$982
125
MMBtu
$701,513
-
$
$39,168
-
$
TOTAL IMPLEMENTED Savings:
$213,072
Cost:
$61,730
$1,983 58,465 $1,334 154 $982 125 $208,773 - - - $1,983
58,465
kWh
$1,334
154
kW-months/year
$982
125
MMBtu
$208,773
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product