Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2002 |
Principal Product | Procesed turkey products |
NAICS | n/a |
SIC | 2015 - Poultry Slaughtering And Processing |
Sales | $100,000,000-$500,000,000 |
# of Employees | 936 |
Plant Area (Sq.Ft.) | 240,446 |
Annual Production | 112,500 Tons |
Production Hrs. Annual | 6,000 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $830,915 | 27,532,800 | kWh | $0.03 |
Electricity Demand | $490,037 | 58,560 | kW-months/year | $8.37 |
Natural Gas | $759,747 | 134,764 | MMBtu | $5.64 |
TOTAL ENERGY COSTS | $2,516,700 | |||
RECOMMENDED SAVINGS* | $129,689 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,222 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,161 Cost: $313 |
$2,033 | 67,980 | $1,128 | 136 | - | - | - | - | - | - | - | - |
$2,033 67,980 kWh |
$1,128 136 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,061 Cost: $20 |
$682 | 22,800 | $379 | 46 | - | - | - | - | - | - | - | - |
$682 22,800 kWh |
$379 46 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,500 Cost: - |
$3,534 | 118,200 | $1,966 | 236 | - | - | - | - | - | - | - | - |
$3,534 118,200 kWh |
$1,966 236 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,641 Cost: $19,029 |
$4,057 | 135,683 | $2,584 | 311 | - | - | - | - | - | - | - | - |
$4,057 135,683 kWh |
$2,584 311 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $380 Cost: $532 |
$380 | 12,708 | - | - | - | - | - | - | - | - | - | - |
$380 12,708 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $6,026 Cost: - |
$3,871 | 129,480 | $2,155 | 259 | - | - | - | - | - | - | - | - |
$3,871 129,480 kWh |
$2,155 259 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $8,655 Cost: $1,000 |
- | - | - | - | $8,655 | 1,639 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,655 1,639 MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $2,260 Cost: $2,000 |
- | - | - | - | $2,260 | 428 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,260 428 MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $95,697 Cost: $127,000 |
$(-2,153) | (-72,000) | $(-150) | (-18) | - | - | - | - | $98,000 | - | - | - |
$(-2,153) (-72,000) kWh |
$(-150) (-18) kW-months/year |
- - MMBtu |
- - Tgal |
$98,000 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4151 MINIMIZE WATER USAGE |
Savings: $308 Cost: $100 |
- | - | - | - | - | - | $305 | 192,000 | - | - | $3 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$305 192,000 Tgal |
- - $ |
$3 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $129,689 Cost: $149,994 |
$12,404 | 414,851 | $8,062 | 970 | $10,915 | 2,067 | $305 | 192,000 | $98,000 | - | $3 | - | $12,404 414,851 kWh |
$8,062 970 kW-months/year |
$10,915 2,067 MMBtu |
$305 192,000 Tgal |
$98,000 - $ |
$3 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,222 Cost: $333 |
$2,715 | 90,780 | $1,507 | 182 | - | - | - | - | - | - | - | - | $2,715 90,780 kWh |
$1,507 182 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Water Consumption |