Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2002 |
Principal Product | Modular mobile houses |
NAICS | n/a |
SIC | 2457 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 170 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 1,200 Pieces |
Production Hrs. Annual | 2,340 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $25,106 | 793,536 | kWh | $0.03 |
Electricity Demand | $32,326 | 3,312 | kW-months/year | $9.76 |
Natural Gas | $60,793 | 6,604 | MMBtu | $9.21 |
TOTAL ENERGY COSTS | $119,405 | |||
RECOMMENDED SAVINGS* | $47,985 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,667 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,367 Cost: $443 |
$518 | 16,335 | $849 | 87 | - | - | - | - | - | - |
$518 16,335 kWh |
$849 87 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $705 Cost: $169 |
$214 | 6,756 | $491 | 50 | - | - | - | - | - | - |
$214 6,756 kWh |
$491 50 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $12,209 Cost: $8,444 |
$626 | 19,760 | $2,223 | 228 | - | - | $9,360 | - | - | - |
$626 19,760 kWh |
$2,223 228 kW-months/year |
- - lb |
$9,360 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,300 Cost: $237 |
$504 | 15,912 | $796 | 82 | - | - | - | - | - | - |
$504 15,912 kWh |
$796 82 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $104 Cost: $333 |
$104 | 3,272 | - | - | - | - | - | - | - | - |
$104 3,272 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $32,300 Cost: $15,336 |
- | - | - | - | $28,900 | - | - | - | $3,400 | - |
- - kWh |
- - kW-months/year |
$28,900 - lb |
- - $ |
$3,400 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,985 Cost: $24,962 |
$1,966 | 62,035 | $4,359 | 447 | $28,900 | - | $9,360 | - | $3,400 | - | $1,966 62,035 kWh |
$4,359 447 kW-months/year |
$28,900 - lb |
$9,360 - $ |
$3,400 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,667 Cost: $680 |
$1,022 | 32,247 | $1,645 | 169 | - | - | - | - | - | - | $1,022 32,247 kWh |
$1,645 169 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | By-product Production |