IAC logo
IAC Assessment: IA0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2002
Principal Product Modular mobile houses
NAICS n/a
SIC 2457 -
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 100,000
Annual Production 1,200 Pieces
Production Hrs. Annual 2,340
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,106 793,536 kWh $0.03
Electricity Demand $32,326 3,312 kW-months/year $9.76
Natural Gas $60,793 6,604 MMBtu $9.21
TOTAL ENERGY COSTS $119,405
RECOMMENDED SAVINGS* $47,985 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,667
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,367
Cost:
$443
$518 16,335 $849 87 - - - - - - $518
16,335
kWh
$849
87
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$705
Cost:
$169
$214 6,756 $491 50 - - - - - - $214
6,756
kWh
$491
50
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$12,209
Cost:
$8,444
$626 19,760 $2,223 228 - - $9,360 - - - $626
19,760
kWh
$2,223
228
kW-months/year
-
-
lb
$9,360
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,300
Cost:
$237
$504 15,912 $796 82 - - - - - - $504
15,912
kWh
$796
82
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$104
Cost:
$333
$104 3,272 - - - - - - - - $104
3,272
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$32,300
Cost:
$15,336
- - - - $28,900 - - - $3,400 - -
-
kWh
-
-
kW-months/year
$28,900
-
lb
-
-
$
$3,400
-
$
TOTAL RECOMMENDED Savings:
$47,985
Cost:
$24,962
$1,966 62,035 $4,359 447 $28,900 - $9,360 - $3,400 - $1,966
62,035
kWh
$4,359
447
kW-months/year
$28,900
-
lb
$9,360
-
$
$3,400
-
$
TOTAL IMPLEMENTED Savings:
$2,667
Cost:
$680
$1,022 32,247 $1,645 169 - - - - - - $1,022
32,247
kWh
$1,645
169
kW-months/year
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes By-product Production