IAC Assessment: IA0304
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0304
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2002
Principal Product Plastic Film Products
NAICS n/a
SIC 3082 - Unsupported Plastics Profile Shapes
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 225,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $289,988 10,044,960 kWh $0.03
Electricity Demand $149,206 21,552 kW-months/year $6.92
Natural Gas $77,410 18,054 MMBtu $4.29
TOTAL ENERGY COSTS $529,447
RECOMMENDED SAVINGS* $35,519 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,685
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,847
Cost:
$866
$2,015 69,960 $832 121 - - $2,015
69,960
kWh
$832
121
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,497
Cost:
$100
$1,019 35,391 $478 70 - - $1,019
35,391
kWh
$478
70
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$114
Cost:
$17
$48 1,664 $66 10 - - $48
1,664
kWh
$66
10
kW-months/year
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$532
Cost:
$400
$532 18,467 - - - - $532
18,467
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$975
Cost:
$1,200
- - - - $975 250 -
-
kWh
-
-
kW-months/year
$975
250
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,617
Cost:
-
$5,739 199,278 $1,878 274 - - $5,739
199,278
kWh
$1,878
274
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$309
Cost:
$600
$309 10,746 - - - - $309
10,746
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,112
Cost:
$11,834
$4,085 141,832 $2,027 295 - - $4,085
141,832
kWh
$2,027
295
kW-months/year
-
-
MMBtu
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,426
Cost:
-
$1,072 37,232 $354 52 - - $1,072
37,232
kWh
$354
52
kW-months/year
-
-
MMBtu
10: 2.6232 INSTALL SET-BACK TIMERS Savings:
$101
Cost:
$197
$101 3,494 - - - - $101
3,494
kWh
-
-
kW-months/year
-
-
MMBtu
11: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$13,904
Cost:
$4,000
$11,208 389,169 $2,696 393 - - $11,208
389,169
kWh
$2,696
393
kW-months/year
-
-
MMBtu
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$85
Cost:
$180
$85 2,957 - - - - $85
2,957
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$35,519
Cost:
$19,394
$26,213 910,190 $8,331 1,215 $975 250 $26,213
910,190
kWh
$8,331
1,215
kW-months/year
$975
250
MMBtu
TOTAL IMPLEMENTED Savings:
$10,685
Cost:
$13,094
$7,406 257,139 $3,279 478 - - $7,406
257,139
kWh
$3,279
478
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas