Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2003 |
Principal Product | Meat Packaging |
NAICS | 311613 - Rendering and Meat Byproduct Processing |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 87,674 |
Annual Production | 10,500 Tons |
Production Hrs. Annual | 2,500 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $317,163 | 8,986,105 | kWh | $0.04 |
Natural Gas | $66,743 | 13,293 | MMBtu | $5.02 |
TOTAL ENERGY COSTS | $383,906 | |||
RECOMMENDED SAVINGS* | $17,293 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,083 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Ancillary Material Cost | Electricity Usage | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,140 Cost: $4,916 |
$3,140 | 89,230 | - | - | - | - |
$3,140 89,230 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $551 Cost: $64 |
$551 | 15,649 | - | - | - | - |
$551 15,649 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $367 Cost: $20 |
$367 | 10,425 | - | - | - | - |
$367 10,425 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $167 Cost: $14 |
$167 | 4,750 | - | - | - | - |
$167 4,750 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $6,380 Cost: $18,000 |
- | - | $6,380 | 1,271 | - | - |
- - kWh |
$6,380 1,271 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,330 Cost: $1,000 |
- | - | $1,330 | 265 | - | - |
- - kWh |
$1,330 265 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $528 Cost: $800 |
- | - | $528 | 105 | - | - |
- - kWh |
$528 105 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $779 Cost: $1,530 |
$779 | 22,143 | - | - | - | - |
$779 22,143 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $560 Cost: $560 |
$560 | 15,876 | - | - | - | - |
$560 15,876 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $522 Cost: $860 |
$522 | 14,822 | - | - | - | - |
$522 14,822 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $2,969 Cost: $5,770 |
- | - | - | - | $2,969 | - |
- - kWh |
- - MMBtu |
$2,969 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,293 Cost: $33,534 |
$6,086 | 172,895 | $8,238 | 1,641 | $2,969 | - | $6,086 172,895 kWh |
$8,238 1,641 MMBtu |
$2,969 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,083 Cost: $6,814 |
$4,225 | 120,054 | $1,858 | 370 | - | - | $4,225 120,054 kWh |
$1,858 370 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Ancillary Material Cost | Electricity Usage | Natural Gas | Ancillary Material Cost |