IAC logo
IAC Assessment: IA0318
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0318
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2003
Principal Product pressure sensitive labels
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672 - Paper Coated And Laminated, Nec
Sales $50,000,000-$100,000,000
# of Employees 325
Plant Area (Sq.Ft.) 155,000
Annual Production 52,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,488 6,197,100 kWh $0.02
Electricity Demand $128,772 12,924 kW-months/year $9.96
Natural Gas $15,095 2,849 MMBtu $5.30
TOTAL ENERGY COSTS $292,752
RECOMMENDED SAVINGS* $53,857 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,875
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$572
Cost:
$69
$332 14,226 $240 28 - - $332
14,226
kWh
$240
28
kW-months/year
-
-
lb
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$701
Cost:
$25
$409 17,472 $292 34 - - $409
17,472
kWh
$292
34
kW-months/year
-
-
lb
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$4,583
Cost:
$3,100
$2,673 114,192 $1,910 220 - - $2,673
114,192
kWh
$1,910
220
kW-months/year
-
-
lb
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$370
Cost:
$202
$216 9,229 $154 18 - - $216
9,229
kWh
$154
18
kW-months/year
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,933
Cost:
$1,440
$1,127 48,167 $806 93 - - $1,127
48,167
kWh
$806
93
kW-months/year
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,575
Cost:
$5,663
$918 39,237 $657 76 - - $918
39,237
kWh
$657
76
kW-months/year
-
-
lb
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$203
Cost:
$532
$203 8,715 - - - - $203
8,715
kWh
-
-
kW-months/year
-
-
lb
08: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$43,920
Cost:
$320
- - - - $43,920 - -
-
kWh
-
-
kW-months/year
$43,920
-
lb
TOTAL RECOMMENDED Savings:
$53,857
Cost:
$11,351
$5,878 251,238 $4,059 469 $43,920 - $5,878
251,238
kWh
$4,059
469
kW-months/year
$43,920
-
lb
TOTAL IMPLEMENTED Savings:
$2,875
Cost:
$1,711
$1,675 71,622 $1,200 139 - - $1,675
71,622
kWh
$1,200
139
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)