Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2003 |
Principal Product | hydraulic motors and power steering units |
NAICS | 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3569 - General Industrial Machinery, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 267 |
Plant Area (Sq.Ft.) | 184,000 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 6,864 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $568,679 | 18,059,656 | kWh | $0.03 |
Electricity Demand | $258,021 | 36,480 | kW-months/year | $7.07 |
Natural Gas | $77,628 | 17,158 | MMBtu | $4.52 |
TOTAL ENERGY COSTS | $904,328 | |||
RECOMMENDED SAVINGS* | $47,007 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,559 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,539 Cost: $449 |
$2,970 | 91,710 | $1,569 | 161 | - | - | - | - | - | - |
$2,970 91,710 kWh |
$1,569 161 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,376 Cost: $457 |
$2,246 | 69,085 | $1,130 | 122 | - | - | - | - | - | - |
$2,246 69,085 kWh |
$1,130 122 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,892 Cost: $25 |
$5,175 | 159,245 | $2,717 | 278 | - | - | - | - | - | - |
$5,175 159,245 kWh |
$2,717 278 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $6,565 Cost: $7,100 |
$4,305 | 132,475 | $2,260 | 232 | - | - | - | - | - | - |
$4,305 132,475 kWh |
$2,260 232 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $520 Cost: $888 |
$485 | 14,903 | $35 | 3 | - | - | - | - | - | - |
$485 14,903 kWh |
$35 3 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,629 Cost: $3,694 |
$4,346 | 133,725 | $2,283 | 234 | - | - | - | - | - | - |
$4,346 133,725 kWh |
$2,283 234 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $2,436 Cost: $2,132 |
$2,103 | 64,713 | - | - | $333 | 74 | - | - | - | - |
$2,103 64,713 kWh |
- - kW-months/year |
$333 74 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $10,500 Cost: - |
- | - | - | - | - | - | $10,500 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$10,500 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT |
Savings: $4,550 Cost: $2,800 |
- | - | - | - | - | - | - | - | $4,550 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$4,550 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,007 Cost: $17,545 |
$21,630 | 665,856 | $9,994 | 1,030 | $333 | 74 | $10,500 | - | $4,550 | - | $21,630 665,856 kWh |
$9,994 1,030 kW-months/year |
$333 74 MMBtu |
$10,500 - lb |
$4,550 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,559 Cost: $1,337 |
$3,455 | 106,613 | $1,604 | 164 | - | - | $10,500 | - | - | - | $3,455 106,613 kWh |
$1,604 164 kW-months/year |
- - MMBtu |
$10,500 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |