IAC Assessment: IA0336
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0336
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2004
Principal Product Pork Products
NAICS 112210 - Hog and Pig Farming
SIC 2013 - Sausages And Other Prepared Meats
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 70,000
Annual Production 750,000 Pieces
Production Hrs. Annual 2,860
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,153 4,172,000 kWh $0.03
Electricity Demand $89,078 9,408 kW-months/year $9.47
Electricity Fees $16,557 - $ -
Natural Gas $313,075 61,187 MMBtu $5.12
LPG $18,745 3,671 MMBtu $5.11
TOTAL ENERGY COSTS $556,608
RECOMMENDED SAVINGS* $56,596 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,651
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$3,854
Cost:
$4,300
- - - - $3,261 637 $593 - -
-
kWh
-
-
kW-months/year
$3,261
637
MMBtu
$593
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,930
Cost:
$20,000
- - - - $17,930 3,505 - - -
-
kWh
-
-
kW-months/year
$17,930
3,505
MMBtu
-
-
$
03: 2.1224 REPLACE BOILER Savings:
$27,684
Cost:
$150,000
- - - - $27,684 5,407 - - -
-
kWh
-
-
kW-months/year
$27,684
5,407
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$199
Cost:
$80
$102 3,528 $97 10 - - - - $102
3,528
kWh
$97
10
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$499
Cost:
$400
$289 7,235 $210 30 - - - - $289
7,235
kWh
$210
30
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,139
Cost:
$1,364
$1,312 45,171 $827 87 - - - - $1,312
45,171
kWh
$827
87
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,346
Cost:
$1,197
$718 24,764 $628 66 - - - - $718
24,764
kWh
$628
66
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$906
Cost:
$7,407
$906 31,198 - - - - - - $906
31,198
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,039
Cost:
$7,405
$1,161 40,040 $878 92 - - - - $1,161
40,040
kWh
$878
92
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$56,596
Cost:
$192,153
$4,488 151,936 $2,640 285 $48,875 9,549 $593 - $4,488
151,936
kWh
$2,640
285
kW-months/year
$48,875
9,549
MMBtu
$593
-
$
TOTAL IMPLEMENTED Savings:
$53,651
Cost:
$177,341
$2,421 80,698 $1,762 193 $48,875 9,549 $593 - $2,421
80,698
kWh
$1,762
193
kW-months/year
$48,875
9,549
MMBtu
$593
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost