Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2004 |
Principal Product | modular homes and ATM kiosks |
NAICS | 321992 - Prefabricated Wood Building Manufacturing |
SIC | 2452 - Prefabricated Wood Buildings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 172,700 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 2,600 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $49,703 | 1,278,660 | kWh | $0.04 |
Electricity Demand | $34,588 | 4,812 | kW-months/year | $7.19 |
Natural Gas | $74,103 | 9,952 | MMBtu | $7.45 |
TOTAL ENERGY COSTS | $172,659 | |||
RECOMMENDED SAVINGS* | $17,824 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,774 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,090 Cost: $1,131 |
$1,108 | 28,338 | $982 | 137 | - | - | - | - |
$1,108 28,338 kWh |
$982 137 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,097 Cost: $757 |
$1,132 | 29,094 | $965 | 134 | - | - | - | - |
$1,132 29,094 kWh |
$965 134 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $151 Cost: $16 |
$80 | 2,047 | $71 | 10 | - | - | - | - |
$80 2,047 kWh |
$71 10 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $178 Cost: $16 |
$96 | 2,407 | $82 | 11 | - | - | - | - |
$96 2,407 kWh |
$82 11 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $196 Cost: $532 |
$196 | 5,021 | - | - | - | - | - | - |
$196 5,021 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,587 Cost: $300 |
$848 | 21,746 | $739 | 103 | - | - | - | - |
$848 21,746 kWh |
$739 103 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $11,525 Cost: $15,332 |
- | - | - | - | $9,400 | 683,620 | $2,125 | - |
- - kWh |
- - kW-months/year |
$9,400 683,620 lb |
$2,125 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,824 Cost: $18,084 |
$3,460 | 88,653 | $2,839 | 395 | $9,400 | 683,620 | $2,125 | - | $3,460 88,653 kWh |
$2,839 395 kW-months/year |
$9,400 683,620 lb |
$2,125 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,774 Cost: $2,188 |
$3,088 | 79,178 | $2,686 | 374 | - | - | - | - | $3,088 79,178 kWh |
$2,686 374 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | By-product Production |