IAC Assessment: IA0348
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0348
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2004
Principal Product paving and construction equipment
NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $100,000,000-$500,000,000
# of Employees 700
Plant Area (Sq.Ft.) 350,000
Annual Production 2,250 Pieces
Production Hrs. Annual 5,460
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $224,461 7,303,900 kWh $0.03
Electricity Demand $165,719 20,808 kW-months/year $7.96
Natural Gas $197,290 28,714 MMBtu $6.87
TOTAL ENERGY COSTS $587,470
RECOMMENDED SAVINGS* $37,751 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,839
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,818
Cost:
$10,704
- - - - $9,818 - - - - - -
-
kWh
-
-
kW-months/year
$9,818
-
$
-
-
MMBtu
-
-
$
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,336
Cost:
$475
$841 27,300 $495 60 - - - - - - $841
27,300
kWh
$495
60
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$651
Cost:
$146
$410 13,309 $241 24 - - - - - - $410
13,309
kWh
$241
24
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,888
Cost:
$535
$2,697 87,413 $1,591 192 - - - - $(-400) - $2,697
87,413
kWh
$1,591
192
kW-months/year
-
-
$
-
-
MMBtu
$(-400)
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,829
Cost:
$14,216
$2,158 70,044 $2,671 323 - - - - - - $2,158
70,044
kWh
$2,671
323
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$193
Cost:
$438
- - - - - - $193 28 - - -
-
kWh
-
-
kW-months/year
-
-
$
$193
28
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$383
Cost:
$120
$176 5,706 $207 25 - - - - - - $176
5,706
kWh
$207
25
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,653
Cost:
$4,596
$1,648 53,508 $970 118 - - $14,035 2,043 - - $1,648
53,508
kWh
$970
118
kW-months/year
-
-
$
$14,035
2,043
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$37,751
Cost:
$31,230
$7,930 257,280 $6,175 742 $9,818 - $14,228 2,071 $(-400) - $7,930
257,280
kWh
$6,175
742
kW-months/year
$9,818
-
$
$14,228
2,071
MMBtu
$(-400)
-
$
TOTAL IMPLEMENTED Savings:
$35,839
Cost:
$30,197
$6,913 224,274 $5,473 657 $9,818 - $14,035 2,043 $(-400) - $6,913
224,274
kWh
$5,473
657
kW-months/year
$9,818
-
$
$14,035
2,043
MMBtu
$(-400)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes