IAC Assessment: IA0359
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0359
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2005
Principal Product Juices, dressings, and sauces
NAICS 311941 - Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $50,000,000-$100,000,000
# of Employees 138
Plant Area (Sq.Ft.) 110,000
Annual Production 200,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,980 2,928,623 kWh $0.03
Electricity Demand $37,125 6,496 kW-months/year $5.72
Electricity Fees $5,559 - $ -
Natural Gas $244,690 33,509 MMBtu $7.30
TOTAL ENERGY COSTS $386,354
RECOMMENDED SAVINGS* $32,310 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,051
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$15,800
Cost:
$6,352
- - $800 83 - - - - $15,000 - -
-
kWh
$800
83
kW-months/year
-
-
MMBtu
-
-
$
$15,000
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$774
Cost:
$76
$414 19,842 $360 38 - - - - - - $414
19,842
kWh
$360
38
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,024
Cost:
$790
$3,221 154,128 $2,803 296 - - - - - - $3,221
154,128
kWh
$2,803
296
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,593
Cost:
$500
$761 36,400 - - - - $2,832 - - - $761
36,400
kWh
-
-
kW-months/year
-
-
MMBtu
$2,832
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$518
Cost:
$30,000
$277 13,292 $241 25 - - - - - - $277
13,292
kWh
$241
25
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$299
Cost:
$504
$299 14,283 - - - - - - - - $299
14,283
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$1,436
Cost:
$1,000
- - - - $1,436 198 - - - - -
-
kWh
-
-
kW-months/year
$1,436
198
MMBtu
-
-
$
-
-
$
08: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$3,866
Cost:
$1,223
- - - - - - $3,866 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,866
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,310
Cost:
$40,445
$4,972 237,945 $4,204 442 $1,436 198 $6,698 - $15,000 - $4,972
237,945
kWh
$4,204
442
kW-months/year
$1,436
198
MMBtu
$6,698
-
$
$15,000
-
$
TOTAL IMPLEMENTED Savings:
$9,051
Cost:
$32,370
$4,211 201,545 $3,404 359 $1,436 198 - - - - $4,211
201,545
kWh
$3,404
359
kW-months/year
$1,436
198
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Product