IAC Assessment: IA0380
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0380
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2006
Principal Product ham, sausage, bacon
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $5,000,000-$10,000,000
# of Employees 94
Plant Area (Sq.Ft.) 70,000
Annual Production 5,800,000 Pounds
Production Hrs. Annual 2,959
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,878 2,163,657 kWh $0.05
Electricity Demand $29,400 5,424 kW-months/year $5.42
Electricity Fees $1,581 - $ -
TOTAL ENERGY COSTS $171,636
RECOMMENDED SAVINGS* $54,783 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,283
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$336
Cost:
$25
$232 4,374 $104 19 - - - - - - - - $232
4,374
kWh
$104
19
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$685
Cost:
$215
$471 9,617 $214 40 - - - - - - - - $471
9,617
kWh
$214
40
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$262
Cost:
$879
$213 4,343 $49 9 - - - - - - - - $213
4,343
kWh
$49
9
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,513
Cost:
$8,142
$2,801 56,975 $712 130 - - - - - - - - $2,801
56,975
kWh
$712
130
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,037
Cost:
$1,906
$2,432 49,999 $605 112 - - - - - - - - $2,432
49,999
kWh
$605
112
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$11,632
Cost:
$4,000
- - - - - - $7,368 1,469,700 - - $4,264 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,368
1,469,700
Tgal
-
-
$
$4,264
-
Tgal
07: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$298
Cost:
$650
- - - - - - $189 37,677 - - $109 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$189
37,677
Tgal
-
-
$
$109
-
Tgal
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$35,020
Cost:
$29,000
- - - - $5,430 725 - - $29,590 - - - -
-
kWh
-
-
kW-months/year
$5,430
725
MMBtu
-
-
Tgal
$29,590
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$54,783
Cost:
$44,817
$6,149 125,308 $1,684 310 $5,430 725 $7,557 1,507,377 $29,590 - $4,373 - $6,149
125,308
kWh
$1,684
310
kW-months/year
$5,430
725
MMBtu
$7,557
1,507,377
Tgal
$29,590
-
$
$4,373
-
Tgal
TOTAL IMPLEMENTED Savings:
$1,283
Cost:
$1,119
$916 18,334 $367 68 - - - - - - - - $916
18,334
kWh
$367
68
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Water Consumption