IAC Assessment: IA0390
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0390
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2006
Principal Product Paving Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 33
Plant Area (Sq.Ft.) 17,600
Annual Production 125,000 Tons
Production Hrs. Annual 6,600
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,707 652,000 kWh $0.09
Natural Gas $1,068,710 121,591 MMBtu $8.79
TOTAL ENERGY COSTS $1,129,417
RECOMMENDED SAVINGS* $225,135 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,605
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$53,488
Cost:
$1,000
- - $53,488 5,770 -
-
kWh
$53,488
5,770
MMBtu
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$13,877
Cost:
$850
- - $13,877 1,497 -
-
kWh
$13,877
1,497
MMBtu
03: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$146,308
Cost:
$18,000
- - $146,308 15,783 -
-
kWh
$146,308
15,783
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,812
Cost:
$3,600
- - $8,812 951 -
-
kWh
$8,812
951
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$892
Cost:
$1,124
$892 10,148 - - $892
10,148
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$453
Cost:
$496
$453 5,162 - - $453
5,162
kWh
-
-
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,305
Cost:
$896
$1,305 14,858 - - $1,305
14,858
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$225,135
Cost:
$25,966
$2,650 30,168 $222,485 24,001 $2,650
30,168
kWh
$222,485
24,001
MMBtu
TOTAL IMPLEMENTED Savings:
$63,605
Cost:
$5,496
$1,305 14,858 $62,300 6,721 $1,305
14,858
kWh
$62,300
6,721
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas