IAC Assessment: IA0402
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0402
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2007
Principal Product Handles and Latches
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 130,000
Annual Production 5,500,000 Pieces
Production Hrs. Annual 8,736
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $334,933 5,905,800 kWh $0.06
Electricity Demand $22,003 12,372 kW-months/year $1.78
Natural Gas $217,712 21,301 MMBtu $10.22
TOTAL ENERGY COSTS $574,648
RECOMMENDED SAVINGS* $101,084 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $98,813
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,419
Cost:
$512
$2,322 41,057 $97 56 - - $2,322
41,057
kWh
$97
56
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,179
Cost:
$1,720
$4,964 87,852 $215 142 - - $4,964
87,852
kWh
$215
142
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$36,343
Cost:
$44,874
$34,837 616,584 $1,506 847 - - $34,837
616,584
kWh
$1,506
847
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$993
Cost:
$6,575
$841 14,893 $152 86 - - $841
14,893
kWh
$152
86
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,589
Cost:
$7,711
$2,483 43,994 $106 60 - - $2,483
43,994
kWh
$106
60
kW-months/year
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$116
Cost:
$158
$110 1,950 $6 3 - - $110
1,950
kWh
$6
3
kW-months/year
-
-
MMBtu
07: 2.2514 COVER OPEN TANKS Savings:
$6,793
Cost:
$599
- - - - $6,793 665 -
-
kWh
-
-
kW-months/year
$6,793
665
MMBtu
08: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$229
Cost:
$137
- - - - $229 22 -
-
kWh
-
-
kW-months/year
$229
22
MMBtu
09: 2.1134 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES Savings:
$765
Cost:
$667
- - - - $765 75 -
-
kWh
-
-
kW-months/year
$765
75
MMBtu
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,271
Cost:
$3,989
- - - - $2,271 222 -
-
kWh
-
-
kW-months/year
$2,271
222
MMBtu
11: 2.7314 REDUCE VENTILATION AIR Savings:
$38,317
Cost:
$10,141
- - - - $38,317 3,899 -
-
kWh
-
-
kW-months/year
$38,317
3,899
MMBtu
12: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$5,070
Cost:
$3,770
$5,070 89,742 - - - - $5,070
89,742
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$101,084
Cost:
$80,853
$50,627 896,072 $2,082 1,194 $48,375 4,883 $50,627
896,072
kWh
$2,082
1,194
kW-months/year
$48,375
4,883
MMBtu
TOTAL IMPLEMENTED Savings:
$98,813
Cost:
$76,864
$50,627 896,072 $2,082 1,194 $46,104 4,661 $50,627
896,072
kWh
$2,082
1,194
kW-months/year
$46,104
4,661
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas