IAC Assessment: IA0411
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0411
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2007
Principal Product Animal Vaccines
NAICS 325414 - Biological Product (except Diagnostic) Manufacturing
SIC 2836 - Biological Products Exc. Diagnostic
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 153,258
Annual Production 47,000,000 Units
Production Hrs. Annual 2,375
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,764 6,918,528 kWh $0.03
Electricity Demand $82,162 13,404 kW-months/year $6.13
Electricity Fees $7,128 - $ -
Natural Gas $290,325 30,218 MMBtu $9.61
TOTAL ENERGY COSTS $601,379
RECOMMENDED SAVINGS* $30,610 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,572
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,897
Cost:
$28,132
$3,243 151,471 $4,654 761 - - $3,243
151,471
kWh
$4,654
761
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$419
Cost:
$1,309
$419 19,575 - - - - $419
19,575
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$618
Cost:
$1,000
- - - - $618 66 -
-
kWh
-
-
kW-months/year
$618
66
MMBtu
04: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$833
Cost:
$150
- - - - $833 89 -
-
kWh
-
-
kW-months/year
$833
89
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$911
Cost:
$1,275
$640 29,908 $271 46 - - $640
29,908
kWh
$271
46
kW-months/year
-
-
MMBtu
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$17,816
Cost:
$1,375
$485 22,690 - - $17,331 1,858 $485
22,690
kWh
-
-
kW-months/year
$17,331
1,858
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$441
Cost:
$410
$287 13,395 $154 26 - - $287
13,395
kWh
$154
26
kW-months/year
-
-
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,675
Cost:
$33
$1,157 54,067 $518 85 - - $1,157
54,067
kWh
$518
85
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,610
Cost:
$33,684
$6,231 291,106 $5,597 918 $18,782 2,013 $6,231
291,106
kWh
$5,597
918
kW-months/year
$18,782
2,013
MMBtu
TOTAL IMPLEMENTED Savings:
$9,572
Cost:
$28,165
$4,400 205,538 $5,172 846 - - $4,400
205,538
kWh
$5,172
846
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas