IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2009
Principal Product Industrail hose
NAICS 326220 - Rubber and Plastics Hoses and Belting Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 280,000
Annual Production 22,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) Ne
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $660,798 20,085,793 kWh $0.03
Electricity Demand $248,414 34,464 kW-months/year $7.21
Natural Gas $533,422 64,514 MMBtu $8.27
TOTAL ENERGY COSTS $1,442,634
RECOMMENDED SAVINGS* $120,860 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,812
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,701
Cost:
$680
$1,901 58,454 $800 113 - - $1,901
58,454
kWh
$800
113
kW-months/year
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,759
Cost:
$17,051
$4,966 152,851 $2,793 392 - - $4,966
152,851
kWh
$2,793
392
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,444
Cost:
$702
$1,720 52,177 $724 102 - - $1,720
52,177
kWh
$724
102
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,935
Cost:
$825
$1,436 44,177 $499 82 - - $1,436
44,177
kWh
$499
82
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,456
Cost:
$650
$4,456 137,098 - - - - $4,456
137,098
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,420
Cost:
$1,820
$7,420 222,898 - - - - $7,420
222,898
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$853
Cost:
$479
$853 26,243 - - - - $853
26,243
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,129
Cost:
$760
- - - - $2,129 259 -
-
kWh
-
-
kW-months/year
$2,129
259
MMBtu
09: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$49,777
Cost:
$70,000
- - - - $49,777 6,063 -
-
kWh
-
-
kW-months/year
$49,777
6,063
MMBtu
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,097
Cost:
$27,000
$25,097 772,208 - - - - $25,097
772,208
kWh
-
-
kW-months/year
-
-
MMBtu
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,289
Cost:
$16,600
$16,289 501,209 - - - - $16,289
501,209
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$120,860
Cost:
$136,567
$64,138 1,967,315 $4,816 689 $51,906 6,322 $64,138
1,967,315
kWh
$4,816
689
kW-months/year
$51,906
6,322
MMBtu
TOTAL IMPLEMENTED Savings:
$46,812
Cost:
$45,541
$43,959 1,351,837 $724 102 $2,129 259 $43,959
1,351,837
kWh
$724
102
kW-months/year
$2,129
259
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas