Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2009 |
Principal Product | navigation products |
NAICS | 334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur |
SIC | 3812 - Search And Navigation Equipment |
Sales | $100,000,000-$500,000,000 |
# of Employees | 900 |
Plant Area (Sq.Ft.) | 238,000 |
Annual Production | 25,000 Pieces |
Production Hrs. Annual | 2,210 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $643,271 | 16,621,056 | kWh | $0.04 |
Electricity Demand | $152,165 | 40,824 | kW-months/year | $3.73 |
Natural Gas | $272,630 | 29,366 | MMBtu | $9.28 |
TOTAL ENERGY COSTS | $1,068,066 | |||
RECOMMENDED SAVINGS* | $65,772 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $301 Cost: $25 |
$239 | 6,188 | $62 | 17 | - | - |
$239 6,188 kWh |
$62 17 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6126 DIRECT WASTE GASSES TO BOILER COMBUSTION AIR |
Savings: $2,004 Cost: $500 |
- | - | - | - | $2,004 | 227 |
- - kWh |
- - kW-months/year |
$2,004 227 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $16,271 Cost: $27,700 |
$12,898 | 334,152 | $3,373 | 907 | - | - |
$12,898 334,152 kWh |
$3,373 907 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $4,852 Cost: $7,025 |
$4,852 | 125,693 | - | - | - | - |
$4,852 125,693 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $686 Cost: $960 |
$686 | 17,787 | - | - | - | - |
$686 17,787 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $8,087 Cost: $6,000 |
- | - | - | - | $8,087 | 699 |
- - kWh |
- - kW-months/year |
$8,087 699 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7314 REDUCE VENTILATION AIR |
Savings: $27,399 Cost: $12,400 |
$1,933 | 50,066 | - | - | $25,466 | 2,882 |
$1,933 50,066 kWh |
- - kW-months/year |
$25,466 2,882 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $6,172 Cost: $2,600 |
$5,452 | 141,255 | $720 | 194 | - | - |
$5,452 141,255 kWh |
$720 194 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $65,772 Cost: $57,210 |
$26,060 | 675,141 | $4,155 | 1,118 | $35,557 | 3,808 | $26,060 675,141 kWh |
$4,155 1,118 kW-months/year |
$35,557 3,808 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |