IAC Assessment: IA0453
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0453
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2010
Principal Product Polyethylene plastic pipe
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 63,000
Annual Production 19,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,686 5,745,600 kWh $0.04
Electricity Demand $96,319 13,584 kW-months/year $7.09
Electricity Fees $380 - $ -
Natural Gas $4,214 715 MMBtu $5.89
TOTAL ENERGY COSTS $326,599
RECOMMENDED SAVINGS* $25,222 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,657
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,157
Cost:
$19,968
$7,902 201,084 $255 36 - - $7,902
201,084
kWh
$255
36
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,082
Cost:
$1,037
$1,082 27,517 - - - - $1,082
27,517
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,755
Cost:
$24,540
$5,592 142,272 $163 23 - - $5,592
142,272
kWh
$163
23
kW-months/year
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,525
Cost:
$11,586
$5,369 136,626 $156 22 - - $5,369
136,626
kWh
$156
22
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$203
Cost:
$25
$196 4,992 $7 1 - - $196
4,992
kWh
$7
1
kW-months/year
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,037
Cost:
$1,500
- - - - $2,037 347 -
-
kWh
-
-
kW-months/year
$2,037
347
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$570
Cost:
$530
$424 10,792 $146 21 - - $424
10,792
kWh
$146
21
kW-months/year
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$678
Cost:
$81
$332 8,487 $346 49 - - $332
8,487
kWh
$346
49
kW-months/year
-
-
MMBtu
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,215
Cost:
$3,400
- - - - $1,215 207 -
-
kWh
-
-
kW-months/year
$1,215
207
MMBtu
TOTAL RECOMMENDED Savings:
$25,222
Cost:
$62,667
$20,897 531,770 $1,073 152 $3,252 554 $20,897
531,770
kWh
$1,073
152
kW-months/year
$3,252
554
MMBtu
TOTAL IMPLEMENTED Savings:
$16,657
Cost:
$36,072
$14,685 373,714 $757 107 $1,215 207 $14,685
373,714
kWh
$757
107
kW-months/year
$1,215
207
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas