Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2010 |
Principal Product | Electronic Display Systems |
NAICS | 334419 - Other Electronic Component Manufacturing |
SIC | 3993 - Signs And Advertising Specialities |
Sales | >$500,000,000 |
# of Employees | 2,400 |
Plant Area (Sq.Ft.) | 740,000 |
Annual Production | 200,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | SD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $510,863 | 15,374,116 | kWh | $0.03 |
Electricity Demand | $367,930 | 33,444 | kW-months/year | $11.00 |
Electricity Fees | $52,729 | - | $ | - |
Natural Gas | $47,691 | 6,029 | MMBtu | $7.91 |
TOTAL ENERGY COSTS | $979,213 | |||
RECOMMENDED SAVINGS* | $11,188 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,607 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,680 Cost: $5,214 |
$1,637 | 49,296 | $1,043 | 95 | - | - |
$1,637 49,296 kWh |
$1,043 95 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,365 Cost: $1,560 |
$1,365 | 41,124 | - | - | - | - |
$1,365 41,124 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,363 Cost: $20 |
$829 | 24,960 | $534 | 48 | - | - |
$829 24,960 kWh |
$534 48 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $218 Cost: $20 |
$86 | 2,600 | $132 | 12 | - | - |
$86 2,600 kWh |
$132 12 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,229 Cost: $300 |
$1,972 | 59,405 | $1,257 | 114 | - | - |
$1,972 59,405 kWh |
$1,257 114 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $980 Cost: $400 |
- | - | - | - | $980 | 125 |
- - kWh |
- - kW-months/year |
$980 125 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,152 Cost: $300 |
$713 | 21,481 | $439 | 42 | - | - |
$713 21,481 kWh |
$439 42 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $201 Cost: $150 |
$74 | 2,281 | $127 | 12 | - | - |
$74 2,281 kWh |
$127 12 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $11,188 Cost: $7,964 |
$6,676 | 201,147 | $3,532 | 323 | $980 | 125 | $6,676 201,147 kWh |
$3,532 323 kW-months/year |
$980 125 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,607 Cost: $7,924 |
$5,761 | 173,587 | $2,866 | 263 | $980 | 125 | $5,761 173,587 kWh |
$2,866 263 kW-months/year |
$980 125 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |